首页> 外文会议>International Mine Water Association Annual Conference >Management of water collection and treatment in the remediation of an uranium mill tailings site
【24h】

Management of water collection and treatment in the remediation of an uranium mill tailings site

机译:铀磨机尾矿现场修复水收集与治疗

获取原文

摘要

As of the-Mid 1990s remediation of former uranium mining and milling sites is under way including the geotechnical stabilisation of tailings storage facilities at Seelingstadt (Germany). With advancing remediation water management requirements evolve facing new challenges: changing chemical water composition, more restrictive concentration limits and shrinking water storage space while the treated water volume just slowly decreases. The paper outlines ways to adapt water collection and treatment strategies to the new challenges and points out the influence of water management on the physical remediation works. Lessons learned for similar remediation projects are presented to allow considering relevant aspects at an early stage of a mining legacy remediation planning.
机译:截至20世纪90年代中期,正在进行前铀采矿和碾磨部位的修复,包括SeelingStadt(德国)的尾矿储存设施的岩土稳定。随着促进后水管理要求面临新挑战:改变化学水量,更严格的浓度限制和储存空间收缩,而处理过的水量慢慢减少。本文概述了适应新挑战的水收集和治疗策略的方法,并指出水管理对物理修复工作的影响。提出了为类似补救项目吸取的经验教训,以便在采矿遗产修正计划的早期阶段考虑相关方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号