首页> 外文会议>Canadian Institute Energy Group's Shutdowns Superconferenece >Closing and Post-Mortem: Conducting a Post- Shutdown Analysis for Continuous Improvement and Closing Success (PPT)
【24h】

Closing and Post-Mortem: Conducting a Post- Shutdown Analysis for Continuous Improvement and Closing Success (PPT)

机译:关闭和后验尸:进行连续改进和关闭成功的关闭分析(PPT)

获取原文

摘要

Conduct turnaround review with key stakeholders. Evaluate labor and service suppliers. Perform daily cost tracking during execution. Document and track action items. Publish turnaround closure report.
机译:通过关键利益相关者进行转变评论。评估劳动和服务供应商。执行期间执行每日成本跟踪。文档和跟踪操作项。发布周转关闭报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利