WBS-based Risk Identification for the Whole Process of Real Estate Project and Countermeasures

机译:基于WBS的房地产项目整个过程的风险识别及对策

获取原文

摘要

The real estate industry is high-risk typically. Real estate project itself has the characteristics of large investment, long cycle, complicated construction technology and susceptible to environmental interference etc. Therefore it is a critical process to identify types and causes of risks, strengthen risk management of development projects to ensure the purpose and goals for enterprise to achieve the steady development. The paper used Work Breakdown Structure (WBS) approach. Made factor analysis, worked breakdown a project into four different stages respectively, the initiation stage, the design and planning stage, the implementation stage and the finishing stage. Quality managed all real estate project factors and identified the major existing risks to achieve risk management process control for real estate project.
机译:房地产业通常是高风险的。房地产项目本身具有大型投资,长周期,复杂的施工技术的特点,易受环境干扰等。因此,它是确定风险类型的关键过程,加强发展项目的风险管理,以确保目的和目标企业实现稳步发展。本文使用了工作崩溃结构(WBS)方法。采用因素分析,将项目分解为四个不同阶段,启动阶段,设计和规划阶段,实施阶段和整理阶段。质量管理所有房地产项目因素,并确定了实现房地产项目风险管理过程控制的主要现有风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号