首页> 外文会议>International Conference on Innovative Computing and Communication >The Risk Analysis and Evaluation of Shanghai Changjiang Tunnel and Bridge Engineering Projects
【24h】

The Risk Analysis and Evaluation of Shanghai Changjiang Tunnel and Bridge Engineering Projects

机译:上海长江隧道桥梁工程项目的风险分析与评价

获取原文

摘要

Fuzzy comprehensive evaluation method for scientific evaluation of the bridge engineering project risk indexes and improvement of the project risk management decision-making levels has some practical value. This paper introduces the Shanghai Changjiang Tunnel and Bridge Engineering's basic situation, analyzes the major risk factors establishing risk evaluation index system based on the Shanghai Changjiang tunnel and bridge engineering and applies the fuzzy comprehensive evaluation method to the comprehensive analysis and evaluation of the project risks obtaining a larger conclusion.
机译:模糊综合评价方法对桥梁工程项目风险指标的科学评价和项目风险管理决策层面的改进具有一些实用价值。本文介绍了上海长江隧道和桥梁工程的基础形势,分析了基于上海长江隧道桥梁工程建立风险评估指标体系的主要风险因素,并将模糊综合评判方法应用于项目风险的综合分析与评价得出较大的结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号