首页> 外文会议>Pipeling Division Specialty Conference >Cambridge Underground: Challenges of Sewer Separation and Stormwater Management
【24h】

Cambridge Underground: Challenges of Sewer Separation and Stormwater Management

机译:剑桥地下:下水道分离和雨水管理的挑战

获取原文

摘要

Cambridge is an old city that is seriously in need of the infrastructure improvements that are now being implemented. Sewer separation and stormwater management projects will alleviate the problem of flooding and threats to public health caused by untreated wastewater discharged to low-lying neighborhoods and the Charles River during heavy rainstorms. Since 1998, S E A Consultants Inc. and Montgomery Watson Harza (S E A/MWH) have been working with the Cambridge Department of Public Works to pinpoint problems within the existing system; develop ways to achieve the program objectives; and plan, design, and oversee construction of over USD325 million in city-wide infrastructure improvements over the next 15 years. Unconventional construction methods in heavily developed urbanized areas such as use of large underground storage tanks, maximizing use of surface storage potential, use of best management practices to reduce floatables and sediment discharges to the Charles River, and applications of trenchless technologies to minimize construction disruptions while improving the infrastructure have been highlights of the program. The paper describes various aspects of the Cambridge sewer separation and stormwater management program, the condition of the existing infrastructure, improvements needed to support future growth, and innovative techniques used to address water quality and quantity considerations. Planning, design, construction, utilities, traffic and pedestrian management, and community participation will be explained as they relate to this program.
机译:剑桥是一个严重需要现在实施的基础设施改进的旧城。下水道分离和雨水管理项目将减轻由未经治疗的废水造成的公共卫生的洪水和威胁问题,在暴雨期间被排放到低洼街区和查尔斯河。自1998年以来,S咨询公司和蒙哥马利沃森哈萨(S E A / MWH)一直与剑桥大部公共部门合作,以确定现有系统内的问题;制定实现计划目标的方法;并计划,设计和监督建设在未来15年内城市广泛的基础设施改善超过3.25亿美元。非常规施工方法在大量开发的城市化领域,如大型地下储罐,最大限度地利用表面储存潜力,利用最佳管理实践将浮动物和沉积物排放到查尔斯河上,以及挖沟技术的应用,以最大限度地减少施工中断提高基础设施一直是该计划的亮点。本文介绍了剑桥下水道分离和雨水管理计划的各个方面,现有基础设施的条件,支持未来增长所需的改进,以及用于解决水质和数量考虑的创新技术。规划,设计,建设,公用事业,交通和行人管理以及社区参与将被解释为与本计划有关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号