首页> 外文会议>Beneath our feet: challenges and solutions >Cambridge Underground: Challenges of Sewer Separation and Stormwater Management
【24h】

Cambridge Underground: Challenges of Sewer Separation and Stormwater Management

机译:剑桥地下:下水道分离和雨水管理的挑战

获取原文
获取原文并翻译 | 示例

摘要

Cambridge is an old city that is seriously in need of the infrastructure improvements that are nowrnbeing implemented. Sewer separation and stormwater management projects will alleviate thernproblem of flooding and threats to public health caused by untreated wastewater discharged tornlow-lying neighborhoods and the Charles River during heavy rainstorms.rnSince 1998, S E A Consultants Inc. and Montgomery Watson Harza (S E A/MWH) have beenrnworking with the Cambridge Department of Public Works to pinpoint problems within thernexisting system; develop ways to achieve the program objectives; and plan, design, and overseernconstruction of over $325 million in city-wide infrastructure improvements over the next 15rnyears. Unconventional construction methods in heavily developed urbanized areas such as use ofrnlarge underground storage tanks, maximizing use of surface storage potential, use of bestrnmanagement practices to reduce floatables and sediment discharges to the Charles River, andrnapplications of trenchless technologies to minimize construction disruptions while improving therninfrastructure have been highlights of the program.rnThe paper describes various aspects of the Cambridge sewer separation and stormwaterrnmanagement program, the condition of the existing infrastructure, improvements needed tornsupport future growth, and innovative techniques used to address water quality and quantityrnconsiderations. Planning, design, construction, utilities, traffic and pedestrian management, andrncommunity participation will be explained as they relate to this program.
机译:剑桥是一个古老的城市,急需目前正在实施的基础设施改进。下水道分离和雨水管理项目将减轻暴雨期间向低洼社区和查尔斯河排放未经处理的废水而造成的洪灾问题和对公共健康的威胁。自1998年以来,SEA Consultants Inc.和Montgomery Watson Harza(SEA / MWH)与剑桥公共工程部门合作,以查明现有系统中的问题;制定实现计划目标的方法;以及在未来15年内计划,设计和监督建设超过3.25亿美元的全市基础设施。在高度发达的城市化地区,采用非常规的施工方法,例如使用大型地下储罐,最大程度地利用地表存储潜力,采用最佳管理方法以减少向查尔斯河的漂浮物和泥沙排放,以及应用非开挖技术以最大程度地减少施工中断并改善基础设施,本文描述了剑桥下水道分离和雨水管理计划的各个方面,现有基础设施的条件,支持未来增长所需的改进以及用于解决水质和水量考虑的创新技术。与该计划有关的计划,设计,施工,公用事业,交通和行人管理以及社区参与将得到解释。

著录项

  • 来源
  • 会议地点 Cleveland OH(US);Cleveland OH(US);Cleveland OH(US)
  • 作者单位

    Vice PresidentS E A Consultants Inc.485 Massachusetts AvenueCambridge, MA 02139Tel No. (617) 498-4685john.struzziery@seacon.com;

    Asst. Commissioner of EngineeringCambridge Department of Public Works147 Hampshire StreetCambridge, MA 02139Tel No. (617) 349-4845 ooriordan@ci.cambridge.ma.us;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道设备;管道运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号