首页> 外文会议>SPE/ICoTA Well Intervention Conference and Exhibition >Customized Subsea Production Flowline Cleanout with Coiled Tubing from aFloating Production Storage and Offloading Vessel
【24h】

Customized Subsea Production Flowline Cleanout with Coiled Tubing from aFloating Production Storage and Offloading Vessel

机译:自定义海底生产流程清洁,带有卷绕管道的卷材生产储存和卸载容器

获取原文

摘要

The recovery of a pipeline inspection gauge(PIG)left in a subsea production flowline in an unknownlocation after a failed cleaning and inspection operation is discussed.Combined with paraffin deposits,theproduction flowline of the best offshore producer in northeast Brazil was completely blocked.Extensive planning was necessary to spot the coiled tubing(CT)equipment to accommodate the deckconfiguration of the floating production storage and offloading(FPSO)vessel and to overcome dimensionaland load capacity limitations.A customized extendable jacking frame was manufactured to support the CTinjector and provide room for a work window.This fit-for-purpose rigging was necessary to enable theviability of the cleanout in the production flowline of the well.CT operation modeling software was used toanalyze the hydraulic and force simulations to verify that the CT would reach the target depth with optimaljetting efficiency and would tailor the cleanout methodology.Paraffin was successfully cleaned from the flowline,and the PIG was released and recovered on surface.The CT was efficiently and safely rigged up on a FPSO without any nonproductive time or service qualityissues.The versatility of CT services to not only deliver intervention services on conventional wells but to alsoadapt to rig up in extreme geometries and environments are showcased along with how CT services canbe applied to flowline interventions.For this case,a customized CT frame was manufactured to overcome the challenges of rigging up on avessel with extremely limited deck space and load capacities and restoring hydrocarbon production aftera failed PIG procedure.
机译:离开海底生产流线在unknownlocation一个失败的清洁和检查操作后管道检测仪(PIG)的恢复discussed.Combined用石蜡存款,在巴西东北部最好的海上石油生产商的theproduction流线完全blocked.Extensive规划有必要发现该连续油管(CT)设备,以容纳浮式生产储存和卸载(FPSO)船的deckconfiguration并克服limitations.A定制可扩展的顶框架被制造,以支持CTinjector并提供空间用于dimensionaland负载能力工作window.This适合于目的的操纵是必要的,以便能够在well.CT操作建模软件的生产流线中清除的theviability使用toanalyze液压和力模拟验证CT将达到与optimaljetting目标深度效率,将定制清洗methodology.Paraffin已成功CL从流线eaned,和猪被释放,在surface.The CT回收量为高效,安全地造了一个FPSO没有任何非生产性时间或CT服务,不仅服务qualityissues.The通用性在传统的井,但提供干预服务alsoadapt来搭起在极端的几何形状和环境与如何canbe施加CT服务流线interventions.For这种情况下沿着展示,定制的CT帧被制造以克服与极其有限的甲板空间和负载能力和上avessel设备安装的挑战恢复烃生产aftera失败PIG过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号