首页> 外文会议>Construction Research Congress >Owner and Contractor Choices and Dilemmas: Contemporary Project Delivery Options
【24h】

Owner and Contractor Choices and Dilemmas: Contemporary Project Delivery Options

机译:所有者和承包商选择和困境:当代项目交付选择

获取原文

摘要

Governmental agencies have increasing options for project delivery and contractual arrangements when procuring and constructing public infrastructure projects. Contractors face the dilemma of selecting the right projects in which to invest their limited pre-construction financial and staff resources. This research investigates the project delivery and procurement methods selected for three large public bridges: Third Crossing Bridge in Kingston, Ontario, the Highway 53 relocation bridge located near Virginia, Minnesota, and the Warman and Martensville interchanges bridges in Saskatoon, Saskatchewan. Data collected through structured interviews with key stakeholders from the respective public agencies and Kiewit Corporation, the common contractor for the projects, compares tri-party/integrated form of agreement (IPD), construction manager/general contractor (CM/GC), and design-build (DB) project award processes and decision-making from the perspectives of the governmental agency and the general contractor. The research results in a comparative diagram summarizing the key advantages and challenges of these project delivery options for use by owners and contractors in their procurement and decision-making processes.
机译:政府机构在采购和建设公共基础设施项目时,增加了项目交付和合同安排的备选方案。承包商面临选择合适项目的困境,以投资其有限的建设预设金融和员工资源。本研究调查了为三大公共桥梁选择的项目交付和采购方法:安大略省金士顿金斯敦的第三卷桥桥,位于弗吉尼亚州,明尼苏达州弗吉尼亚州的53号搬迁大桥,萨斯喀彻温省萨斯卡通的温暖和Martensville互换桥梁。通过各自公共机构和Kiepit Corporation的主要利益攸关方通过结构化访谈,该项目的共同承包商进行了结构性,比较了三方/综合协议形式(IPD),建筑经理/一般承包商(CM / GC)和设计 - 从政府机构和一般承包商的角度来看,从(DB)项目奖励进程和决策。该研究导致了一个比较图,总结了这些项目交付选项的关键优势和挑战,以供业主和承包商在其采购和决策过程中使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号