Supporting a Model for Increased Labor Time Utilization When Engaging Building Information Modeling for Prefabrication

机译:支持劳动时间利用增加的模型,以便在制备预制的信息建模时

获取原文

摘要

Utilizing a building information modeling (BIM) based workflow process, this paper, embedded in a case study environment, defines a workflow model to increase modeling labor time utilization for project teams engaged in prefabrication and installation validation of building components. Through participant observation and structured research methods, the findings highlight the importance of various scheduling techniques, model, and data management procedures, communication protocols, and reality capture processes. This research provides a process framework in which workflows can be streamlined and modeling team labor time utilization rates increased. The increased utilization rates positively impact downstream installation of prefabricated components based upon the coordinated construction model. Additionally, this paper identifies and defines the importance of varying typologies of geometric information within a building information model used for prefabrication in a constrained construction environment. In conclusion, this paper defines an ideal-state project workflow for successfully engaging in BIM-based prefabrication and installation validation in ever changing construction field conditions.
机译:利用基于建筑信息建模(BIM)的工作流程过程,本文嵌入在案例研究环境中,定义了一个工作流模型,以提高从事建筑组件预制和安装验证的项目团队的建模利用率。通过参与者观察和结构化研究方法,调查结果突出了各种调度技术,模型和数据管理程序,通信协议和现实捕获过程的重要性。本研究提供了一个过程框架,其中工作流程可以被简化和建模团队劳动时间利用率增加。基于协调的施工模型,利用率增加的利用率对预制组件的下游安装产生了积极影响。另外,本文识别并确定了在约束施工环境中用于预制的建筑信息模型中的几何信息的变化类型的重要性。总之,本文定义了一个理想状态项目工作流程,用于成功地参与基于BIM的预制件和安装验证,在不断变化的施工现场条件下。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号