首页> 外文会议>International Conference on Human Systems Engineering and Design >Human Factors Integrated System Validation in the Nuclear Power Plant Main Control Room
【24h】

Human Factors Integrated System Validation in the Nuclear Power Plant Main Control Room

机译:人类因素核电站主控室综合系统验证

获取原文

摘要

According to NUREG-0711, Human Factors Verification and Validation is one of the final stages of Human Factors Engineering Program, determining whether an integrated system's design conforms to HF design principles, and enables plant personnel to successfully perform their tasks and other operational goals, assuring plant safety. As the center of monitoring and controlling the Nuclear Power Plant, the Main Control Room is an integrated system comprising varieties of Human System Interfaces, procedures, operators and environment, which should all be included in HF V&V activities. Meanwhile, the comprehensive performance of operators interacting with human machine interfaces would also be evaluated by simulating plant operation conditions. Normally, the previous series of HF activities are known as Integrated System Validation, which would be implemented upon a high fidelity Full Scope Simulator identical with the main control room panels.
机译:根据Nureg-0711,人为因素验证和验证是人类因素工程计划的最后阶段之一,确定集成系统的设计是否符合HF设计原则,并使工厂人员能够成功执行其任务和其他操作目标,确保植物安全。作为监测和控制核电站的中心,主要控制室是一个集成系统,包括人类系统界面,程序,运营商和环境各种综合系统,这些系统都应包含在HF V&V活动中。同时,还通过模拟工厂操作条件来评估运营商与人机界面交互的综合性能。通常,先前系列的HF活动被称为集成系统验证,该验证将在高保真全范围模拟器与主控制室面板相同的情况下实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号