首页> 外文会议>International Conference on Advanced Material Research and Processing Technology >Research on Two-stage RGV Scheduling Based on Simulated Annealing and Tabu Search
【24h】

Research on Two-stage RGV Scheduling Based on Simulated Annealing and Tabu Search

机译:基于模拟退火和禁忌搜索的两级RGV调度研究

获取原文
获取外文期刊封面目录资料

摘要

The scheduling problem of an intelligent machining system,with multiple Computerized Numerical Control Machine(CNCs)and one Rail Automatic Guidance Vehicle(RGV)with manipulator as its core,in a deterministic environment is studied.It is necessary to determine the ratio of the number of CNCs responsible for the first stage to the number of CNCs responsible for the second stage,the location and the moving path of the manipulator.Starting from the scheduling theory of parallel machines,the RGV algorithm based on simulated annealing is used to determine the optimal route of RGV by analyzing the type of machines and the processing time of work pieces.The experimental results show that the scheduling rule can effectively improve the efficiency of intelligent workshop.
机译:在确定性环境中,研究了智能加工系统的调度问题,具有多个计算机化的数字控制机(CNC)和具有机械手的一个轨道自动引导车辆(RGV),在确定性环境中,是必要的确定数量的比率负责第一阶段的数控对第二阶段负责的数量,机械手的位置和移动路径。从并联机器的调度理论开始,基于模拟退火的RGV算法用于确定最佳状态通过分析机器类型和工件的加工时间来进行RGV的路线。实验结果表明,调度规则可以有效提高智能车间的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号