首页> 外文会议>ASME Pressure Vessels amp;amp;amp; Piping Conference >DEFINING THE HOW AND WHEN TO EXECUTE SINGLE STUD REPLACEMENT (SSR) OF BOLTED FLANGED JOINTS
【24h】

DEFINING THE HOW AND WHEN TO EXECUTE SINGLE STUD REPLACEMENT (SSR) OF BOLTED FLANGED JOINTS

机译:定义如何以及何时执行螺栓固定关节的单螺柱更换(SSR)

获取原文
获取外文期刊封面目录资料

摘要

Single Stud Replacement (SSR), or as currently known in ASME PCC-2 as "Hot Bolting " is the removal and replacement of studs on a bolted joint on a one at a time basis in a predetermined sequence. One of the key aspects in the successful execution of this activity is the determination of the appropriate maximum pressure governing the operation. The guidance currently provided in ASME PCC-2 is somewhat arbitrary and vague, and some clearer definition of a technical basis in this area would be valuable to industry in terms of both productivity and safety. To provide additional clarity to this activity, a Task Group within the ASME Post Construction Subcommittee on Flanged Joint Assembly is redrafting the article detailing procedures for Single Stud Replacement. This paper discusses the work and focuses on the task of determining and documenting a technical basis for setting the limits (e.g., maximum pressure, effects of external moments, etc.) to safely execute a Single Stud Replacement operation.
机译:单螺柱更换(SSR),或者当前以ASME PCC-2已知为“热螺栓”是以预定序列的时间施加一个螺栓接头上的移除和更换螺柱。成功执行此活动的关键方面之一是确定适当的控制操作的最大压力。目前在ASME PCC-2中提供的指导有点任意和模糊,并且在这一领域的技术基础上的一些更清晰的定义将在生产力和安全方面对工业有价值。为此活动提供额外的清晰度,法兰联合组件上的ASME后施工小组委员会内的任务组是重新制定了单螺栓更换的文章细节程序。本文讨论了该工作,专注于确定和记录技术基础的任务,以便安全地执行单螺柱更换操作的限制(例如,最大压力,外部矩等)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号