首页> 外文会议>NASTT s No-Dig Show Conference >Crossing the Calumet: Complications and Logistics for the Execution of a Horizontal Curve during a 36-inch Direct Pipe? Installation
【24h】

Crossing the Calumet: Complications and Logistics for the Execution of a Horizontal Curve during a 36-inch Direct Pipe? Installation

机译:穿过Calumet:在36英寸直接管道期间执行水平曲线的并发症和物流?安装

获取原文

摘要

In the fall of 2017, Michels Corporation completed the trenchless installation of a 1,500-foot, 36-inch diameter product pipe underneath the Calumet River south of Chicago, IL. Due to existing infrastructure along the river, the geotechnical conditions in the area, and the sensitive nature of the Calumet River’s ecosystem, a Direct Pipe? installation with nearly a 10 degree horizontal curve proved to be best.The following case study will explain the original feasibility investigation of the trenchless installation, the parameters put forth upon completion of the investigation, the challenges that arose from the given parameters, the engineered systems that were put in place to overcome the challenges, and the project’s overall execution. With the help of all parties involved, Michels was capable of pushing an emerging technology to new limits by designing and implementing a horizontal curve for a 1500-foot, 36-inch diameter, Direct Pipe? installation underneath of one of Chicago’s historic rivers.
机译:2017年秋季,Michels Corporation完成了芝加哥南部的Calumet River下面的1,500英尺,36英寸直径的产品管道的开阔安装。由于沿河的现有基础设施,该地区的岩土条件,以及康马洛河生态系统的敏感性,直接管道?安装近10度水平曲线证明是最好的。以下案例研究将解释灯具完成的原始可行性调查,在完成调查后提出的参数,从给定参数出现的挑战,所以要解决的工程系统,以克服挑战,以及该项目整体执行。在涉及的所有各方的帮助下,Michels能够通过设计和实施1500英尺,36英寸直径直接管道的水平曲线将新兴技术推向新的限制。在芝加哥历史河流之一下面的安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号