首页> 外文会议>NASTT s No-Dig Show Conference >Outfall Replacement under San Elijo Lagoon Marine Reserve
【24h】

Outfall Replacement under San Elijo Lagoon Marine Reserve

机译:在San Elijo泻湖海洋保护区下的排污口更换

获取原文

摘要

San Elijo Joint Powers Authority (SEJPA) is a wastewater/recycled water agency that manages the San Elijo Ocean Outfall System. The outfall system conveys up to 25.5 million gallons per day of treated wastewater from the cities of Encinitas, Escondido, Del Mar, and Solana Beach to the Pacific Ocean for disposal through a 1.5-mile ocean outfall. In 2015, a condition assessment study identified the ocean outfall system as critical infrastructure that would have immediate environmental and financial impacts if it were to fail. Furthermore, due to age and soil conditions, the lagoon section of the outfall system had the highest potential for failure and was reasonably considered at the end of its useful life.SEJPA selected Kennedy/Jenks Consultants to evaluate replacing or rehabilitating the lagoon section of the outfall. The predesign report evaluated open cut and trenchless installation, as well as rehabilitation methods. Horizontal directional drill (HDD) was selected as the preferred method due to reduced environmental impacts and the allowance to install the pipeline at greater depths to avoid conflicts with planned lagoon restoration work. The HDD length was approximately 2,600 linear feet with a bend radius of 1,000-feet, including horizontal and vertical curves. Due to environmental regulations, limited work was allowed within the lagoon and no geotechnical investigation permitted within its boundaries. Extensive project permitting and coordination was required with California Coastal Commission, California Fish and Wildlife, Army Core of Engineers, State Parks, Regional Water Board, and many others. The project was successfully completed in spring 2018.
机译:San Elijo联合国权威机构(SEJPA)是一个用于管理San Elijo海洋排水系统的废水/再生水机构。排污系统从Encinitas,Escondido,Del Mar和Solana Beach的城市传达了每天每天待遇污水的2550万加仑,以便通过1.5英里的海洋排水管提供服务。 2015年,一个条件评估研究确定了海洋排污系统作为关键基础设施,如果失败,那将立即产生环境和财务影响。此外,由于年龄和土壤条件,排污系统的泻湖部分具有最高的失败潜力,并且在其使用寿命结束时合理地考虑。Sejpa选择了肯尼迪/ jenks顾问,以评估替换或恢复排队的泻湖部分。预测报告评估了开放式切割和挖沟装置,以及康复方法。选择水平方向钻头(HDD)作为优选的方法,因为减少了环境影响和在更深入的深度安装管道以避免与计划的泻湖恢复工作冲突。硬盘长度约为2,600个线性脚,弯曲半径为1,000英尺,包括水平和垂直曲线。由于环境法规,在泻湖内允许有限的工作,在其界限内没有允许岩土性调查。加州沿海委员会,加州鱼类和野生动物,工程师,国家公园,区域水板等许多其他人需要广泛的项目允许和协调。该项目于2018年春季成功完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号