The Jamestown–Rio Vista Water Supply project located in Southwest Wyoming was constructed during difficult winter conditions and included three trenchless waterline installation methods. Two crossings of the Green River (each approximately 800 feet long) were completed by Horizontal Directional Drilling (HDD); a 1,200-foot long section of 6-inch PVC pipeline was replaced with 10-inch PVC pipeline by pipe bursting; and four road crossings were completed by Horizontal Auger Boring (HAB) with 24-inch steel casing including one 600-foot long crossing of Interstate-80. Sub-freezing temperatures and flooding caused by ice jams on the Green River complicated construction. Hard rock encountered during HAB crossing of I-80 also provided complications. Fusible PVC was used for the waterline for each of the three trenchless applications on the project. The project engineer was Sunrise Engineering out of Afton, Wyoming and the General Contractor was Western Municipal Construction of Wyoming from Meeteetse, Wyoming. This paper is a case study of the project and a presentation of the lessons learned.
机译:位于怀俄明州西南部的Jamestown-Rio Vista供水项目在困难的冬季条件下构建,包括三个灯具的水线安装方法。通过水平定向钻井(HDD)完成了绿河(大约800英尺长)的两个交叉口;通过管道爆裂,用10英寸PVC管道代替了1,200英尺长的6英寸PVC管道;通过24英寸的钢外壳,卧式螺旋钻(HAB)完成了四条道路交叉路口,包括600英尺长的州际横向-80。由冰堵塞在绿河复杂建设上引起的冰冻温度和洪水。在I-80的HAB交叉期间遇到的硬岩也提供了并发症。熔体PVC用于该项目三个挖沟应用中的每一个的水线。该项目工程师是阿富汗的日出工程,怀俄明州和总承包商是西部市政城市建设,从梅莫明,怀俄明州。本文是对项目的一个案例研究,并介绍了学习的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号