首页> 外文会议>World Multidisciplinary Civil Engineering, Architecture, Urban Planning Symposium >Enablers and Barriers of Lean Implementation in Construction Projects
【24h】

Enablers and Barriers of Lean Implementation in Construction Projects

机译:建筑项目中精益实施的推动因素和障碍

获取原文

摘要

Lean aims to maximize customer satisfaction while minimizing waste.However,Lean philosophy has not been well understood yet in the construction industry for the fact that the complexity and dynamic nature of construction projects bring up uncertainties that may be hardly handled by construction practitioners.Moreover,project-based nature of construction business makes Lean implementation even more challenging for construction people.Even though Lean efforts in construction have recently increased,there are problems with the implementation processes.It is undeniable that successful Lean implementation strongly affects project perfonnance.Therefore,it is essential to reveal enablers and barriers in Lean implementation so that the construction industry practitioners might conduct projects more effectively and satisfy project requirements(i.e.schedule,budget,safety).This study aims to provide a set of core enablers and barriers of Lean implementation in construction projects and guide construction professionals to better satisfy project requirements.Within this context,the study proposes seven major enabler and barrier groups,namely the financial,managerial,technical,workforce,culture,government,and communication and twenty-seven components for each group.Moreover,a survey was designed and administered to Lean practitioners to rank the enablers and barriers based on importance level.Clear understanding of technical requirements in Lean practices was ranked as the most important enabler of Lean implementation whereas lack of top management support was ranked as the most important barrier in the Lean implementation.However,the average rankings were not found to be diverging indicating that selected components of enabler and barrier groups are properly chosen.The study is expected to lead Lean practitioners with creating value to customers while preventing them from experiencing waste.
机译:精益旨在最大限度地提高客户满意度,同时最大限度地减少waste.However,精益的理念一直没有得到很好但在建筑行业了解的事实,复杂性和工程建设造就不确定性,可能通过建设practitioners.Moreover将很难处理的动态性质,施工企业的基于项目的性质使得精益实施更加施工people.Even挑战,虽然在建设精益努力最近增加,但与实施中的问题processes.It不可否认的是,成功实施精益强烈地影响项目perfonnance.Therefore,它是必不可少的揭示精益实施支持和障碍使建筑行业的从业者们可以更有效地开展项目,并满足项目要求(ieschedule,预算,安全性)。本研究旨在提供一套核心推动者和精益实施的障碍建设项目和指导利弊truction专业人士更好地满足项目requirements.Within此背景下,研究提出七大推动者和障碍组,即财务,管理,技术,人力资源,文化,政府,通信和27组件每group.Moreover,一调查设计和管理精益从业人员排名基础上的精益方法的技术要求重要性的认识level.Clear支持和障碍被评为精益实施的最重要的推动者,而缺乏高级管理层的支持被评为最重要的屏障在精益implementation.However,均未发现平均排名要发散,表明推动者和屏障组选定的组件是正确chosen.The研究,预计将导致精益从业者创造价值给客户,同时阻止他们经历的浪费。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号