首页> 外文会议>World Multidisciplinary Civil Engineering, Architecture, Urban Planning Symposium >Scheduling the Production of Precast Concrete Elements Using the Simulated Annealing Metaheuristic Algorithm
【24h】

Scheduling the Production of Precast Concrete Elements Using the Simulated Annealing Metaheuristic Algorithm

机译:使用模拟退火的成群质算法调度预制混凝土元件的生产

获取原文

摘要

The problem of optimal scheduling of construction production is particularly important in the case of production processes of concrete precast structural elements.The most important features characterizing this type of construction production are as follows:-the necessity to produce precast elements in factory conditions in order to make the production process independent of the weather”conditions,-the repeatability of production processes of precast elements.The paper presents a model for scheduling of the production process of concrete precast structural elements.The model is based on the hybrid flow shop problem(HFS problem),in which it is possible to include more than one device/equipment or group of workers performing one type of production process.The model respects the constraints that are characteristic of the production processes of such elements.The issue of discrete optimization,presented in the paper,is NP-hard.Therefore,the authors proposed the original solution of an optimization task in the model using the simulated annealing metaheuristic algorithm.The application of the presented scheduling model is illustrated by a practical calculation example showing the effectiveness of the used optimization algorithm.The model can be successfully used to solve planning tasks of the production process in plants producing concrete precast elements in order to significantly shorten the duration of production process.
机译:施工过程调度的问题是在混凝土的生产工艺的情况下是特别重要的预制表征这种类型的构造生产的结构elements.The最重要的特点如下:-the必要性,以产生在工厂条件预制元件,以便使生产过程独立于天气“条件”, - 预制元件的生产过程的可重复性。本文介绍了混凝土预制结构元素的生产过程的调度模型。该模型基于混合流量店问题(HFS问题),其中可以包括多个设备/设备或执行一种类型的生产过程的工人。模型尊重了这种元素的生产过程的特征的约束。呈现离散优化的问题在论文中,是np-hard。因此,作者提出了Opti的原始解决方案使用模拟退火的成群质算法在模型中的Mization任务。通过实际计算示例说明了所呈现的调度模型的应用,示出了使用的优化算法的有效性。模型可以成功地解决生产过程的规划任务生产混凝土预制元素的植物,以显着缩短生产过程的持续时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号