Camp Sacramento Erosion Control Project - 5 Years Later

机译:萨克拉门托侵蚀控制项目 - 5年后

获取原文

摘要

The Camp Sacramento Erosion Control Master Plan (ECMP) was prepared in 2011 under the direction of the El Dorado County Resource Conservation District. The purpose of the ECMP is to reduce runoff and erosion from barren surfaces that transport soil tothe South Fork American River (SOFAR). In 2012, the initial phase of the ECMP included paving 106.7 meters (350 feet) of steep entry road and construction of two connected detention basins at the base of the paved road. Since initial construction, additional erosion control and habitat improvements prescribed in the ECMP have been implemented through volunteer efforts and have included revegetation, rock-slope protection, a rock-lined channel (RLC), road shoulder improvements, and improved trail definition.The Phase 1 and volunteer-built facilities have been in place for 5 years. The winter season typically includes rainfall runoff and snowmelt events that generate runoff and erosion of Camp Sacramento (Camp) roads and trails. The first four winters were mild, reflecting the ongoing drought. However, the 2016/2017 winter included several large rainfall events and heavy snow. Observations were made during a heavy rain in late October 2016 that yielded several conclusions about the operation of the erosion-control facilities. Key findings included that erosion will continue from nondurable driving and walking areas, necessitating strategic placement of collection basins and runoff control; rock slope protection and organized trails reduce the erosion potential; retention basins will hold water, allowing infiltration into the soil rather than direct runoff to the SOFAR; although temporary facilities built each fall can handle the rainfall/snowmelt conditions, they must be reconstructed annually, and therefore, are not optimal for long-term use; and erosion-control facilities must be consistent with the recreation use of the Camp.
机译:萨克拉门托救济控制总体规划(ECMP)于2011年在El Dorado County Resource Senceation District的指导下编制。 ECMP的目的是减少贫瘠表面的径流和侵蚀,运输土壤南叉美国河流(Sofar)。 2012年,ECMP的初始阶段包括铺设106.7米(350英尺)的陡峭入口路,并在铺砌的道路底座上建造两个连接的拘留盆。由于初步建设,通过志愿者努力实施了ECMP中规定的额外侵蚀控制和栖息地改进,并包括拆卸,摇滚保护,凿岩路线通道(RLC),道路肩部改进和改进的路径定义。该阶段1和志愿者建造的设施已经到位了5年。冬季通常包括降雨径流和雪花事件,产生营地萨克拉门托(营地)道路和小径的径流和侵蚀。前四个冬天是温和的,反映正在进行的干旱。然而,2016/2017冬季包括几个大雨事件和大雪。在2016年10月下旬的大雨期间在大雨中进行了观察结果,这些关于侵蚀控制设施的运作的几个结论。关键发现包括侵蚀将从无纬向驾驶和行走区继续,需要对收集盆地和径流控制的战略安置;摇滚保护和有组织的轨迹降低了侵蚀潜力;保留盆地将持有水,允许渗透到土壤中而不是直接径向径流;虽然每个秋季建造的临时设施可以处理降雨/雪花条件,但它们必须每年重建,因此,对于长期使用来说是不是最佳;和侵蚀控制设施必须与营地的娱乐使用一致。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号