首页> 外文会议>International Erosion Control Association Annual Conference and Expo >Developing a Construction Stormwater Management PhilosophyDuring Project Design
【24h】

Developing a Construction Stormwater Management PhilosophyDuring Project Design

机译:开发建筑雨水管理哲学项目设计

获取原文

摘要

25 years managing construction storm water and erosion and sediment control on heavy civil public works construction projects including three years at the Washington State Department of Transportation (WSDOT) and 22 years at the Port of Seattle. Developed the WSDOT Contractor's Erosion and Sediment Control Lead (CESCL) program in 1996.Developed and manage the Port of Seattle Construction Erosion and Sediment Control Program from 1999 to present and have overseen projects including the construction of a new runway with over 13 million cubic meters of fill, demolition and rebuild of twoexisting runways, and over 2 billion dollars' worth of facility upgrades.
机译:25年管理建筑风暴水和腐蚀和沉积物控制重型公民公共工程建设项目,包括三年在华盛顿州运输部(WSDOT)和22年在西雅图港。在1996年开发了WSDOT承包商的侵蚀和沉积物控制铅(CESCL)计划。从1999年开始并管理了西雅图建筑侵蚀和沉积物控制计划的港口,并监督了项目,包括建造一个超过1300万立方米的新跑道填补,拆迁和重建两家跑道,超过20亿美元的设施升级。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号