首页> 外文会议>International Conference on Manufacturing Technology, Materials and Chemical Engineering >Research on safety risk management of civil construction projects based on risk matrix method
【24h】

Research on safety risk management of civil construction projects based on risk matrix method

机译:基于风险矩阵法的民用建筑项目安全风险管理研究

获取原文

摘要

In the view of the safety characteristics of open-air operation, high mobility and low safety quality of personnel in construction projects, in order to facilitate the systematic management of the safety risks of construction projects, the risk pre-control study of civil construction projects is carried out by using the risk matrix method in advance, the risk sources are identified according to the work task analysis method, and all work tasks and the specific processes of each task are listed in the form of a list. Identifying four types of hazard sources in all work tasks under existing working conditions, including human, machine, ring and pipe, and analyzing them using the risk matrix method, determining the risk value of the hazard sources and classifying the identified risk factors(hazard sources) by physical failure, human error, environmental factors and management deficiencies, It is convenient to take measures from management concept, technical method selection, organizational setting, staffing, system building and so on to improve risk management capability.
机译:在露天运行的安全特性,施工项目中的高流动性和低安全质量,为了促进建设项目安全风险的系统管理,民用建设项目的风险预防研究通过使用风险矩阵方法提前执行,根据工作任务分析方法识别风险源,所有工作任务和每个任务的特定进程都以列表的形式列出。在现有的工作条件下识别所有工作任务中的四种类型的危险来源,包括使用风险矩阵方法分析它们,确定危险源的风险价值并对所确定的风险因素进行分类(危险来源)通过物理失败,人为错误,环境因素和管理缺陷,方便采取管理概念,技术方法选择,组织环境,人员配置,系统建设等措施来提高风险管理能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号