首页> 外文会议>SPE International Conference and Exhibition on Formation Damage Control >Curing Lost Circulation in Fractured Reservoirs Using a Level-Off CementPlugging Method-Case Studies in Drilling and Workover Applications
【24h】

Curing Lost Circulation in Fractured Reservoirs Using a Level-Off CementPlugging Method-Case Studies in Drilling and Workover Applications

机译:使用钻井和解机应用的水平胶凝液悬垂方法造成碎屑储层中丧失循环损失

获取原文

摘要

Controlling lost circulation during drilling operations in a reservoir prone to losses is typically remediedby cement squeezing or plug setting.The aim being to minimize or stop drilling fluid losses and to regainfull returns at surface,and to affect wellbore integrity.Different placement methods of cement plugs havebeen discussed in detail in the literature,except for the'level-off'method,which is particularly effective forcuring complete loss circulation cases.Following the mathematical modeling of this cement plug placementmethod,its design,procedure and execution are discussed,together with some successful field cases,bothdrilling and workover situations in highly-fractured carbonate reservoirs in the Middle East.Using drill pipe and an installed a Retrievable-Test-Treat-Squeeze(RTTS)packer,with some spacingfrom the loss zone,the method entails that the cement slurry is allowed to drop by gravity in order tocure lost circulation.As the column of fluid,mud and slurry in the well exceeds formation pore pressure,i.e.overbalanced conditions,a volume of acid-soluble cement slurry is allowed to slowly drop and freelypenetrate the formation,i.e.through its fractures or caverns.During the penetration of this viscous slurry intothe loss zone,the cement can set and the fracture or fissure openings are plugged.In addition,to minimizeor prevent further losses,this cementing technique may also mitigate formation damage of adjacent zones.Presented are detailed design calculations for the level-off placement technique:determination ofrequired cement slurry and displacement volumes,and recommended displacement and RTTS packer settingdepths.The expected depth of the top of cement is estimated.The design parameters are compared withfield cases and explanations are given for possible discrepancies.Detailed field procedures and executionare also presented.This is the first known,detailed description and modelling of the level-off cement placement techniquein the literature.
机译:在储存器中钻探操作期间控制丢失的循环通常易于损失,通常是水泥挤压或插头设置。目的是最小化或停止钻井液损失并regainfull在表面上返回,并影响水泥塞的不同放置方法在文献中有详细讨论的,除了'Level-off'Method,这是特别有效的强制造成完全损失循环案件。揭示了这种水泥插头涂层的数学建模,其设计,程序和执行是讨论的,以及一些成功的现场案例,既有碎屑碳酸盐储层中的透明情况,兼并的情况。使用钻杆和安装的可检索式试验治疗 - 挤压(RTTS)包装机,其中一些间隔损失区域,该方法需要该方法允许水泥浆料通过重力滴落,以便丧失循环。在井中的液体,泥浆和浆液中的柱子EED形成孔隙压力,IEOverbalanced条件,允许酸溶解水泥浆料的体积慢慢下降并自由缩放形成,耐骨折或洞穴。佩戴这种粘性浆液的渗透,水泥可以设定和堵塞骨折或裂缝开口。此外,对于最小化器来防止进一步的损失,这种固井技术还可以减轻相邻区域的形成损伤。所谓的水泥放置技术的详细设计计算:确定水泥浆料和位移量的确定,和推荐的位移和RTTS包装器套装。估计了水泥顶部的预期深度。与菲尔德情况相比,设计参数与菲尔德案例进行比较,并给出了可能的差异。这是一个众所周知的现场过程和executionare。这是第一个已知的,详细描述和舒适水泥放置技术在文献中的建模。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号