首页> 外文会议>SPE International Conference and Exhibition on Formation Damage Control >Lessons Learned to Avoid Formation Damage Development During WasteSlurry Injection Operations
【24h】

Lessons Learned to Avoid Formation Damage Development During WasteSlurry Injection Operations

机译:经验教训以避免在废物注射操作期间避免形成损伤的发展

获取原文

摘要

The injection of oil and gas wastes produced during the exploration and production phases have been provento be an effective technique toward achieving zero discharge.However,several challenges are associatedwith the injection of slurry into an underground formation.The most common challenge during waste slurryinjection(WSI)is the continuous loss of well injectivity due to poor engineering design of the injectionparameters for most of the current existing WSI wells.For the WSI operation,near wellbore formation damage(including the fracture damage)will be formedby the injected solids.The real time injection monitoring of the ongoing operations is important to correctany operational mistake and adjust the injection parameters in order to ensure the well longevity.The paper discusses the importance of injection monitoring and steps necessary to maintain the injectivityand perform a healthy WSI operation.Three different case studies are presented to highlight the operationalmistakes that caused a significant formation damage development in injectors in Eagle Ford,Haynesville,and Permian Basin shale plays.Certain guidelines depending on the monitoring results are provided inmodifying the slurry rheology,pressure,injection strategy etc.that are helpful in maintaining the injectivity.The presented case studies show that the wells with good monitoring program maintained its injectivityduring the course of its operation compared to the other wells that lost its injectivity sooner.The results from different case studies are used to prepare a set of guidelines that can be used to maintainthe well injectivity and extend the well life.This paper discusses the techniques that will help in eliminatingand avoiding the problems leading to formation damage and well plugging during the WSI operation.
机译:在勘探和生产阶段产生的石油和瓦斯废物的注入是一种有效的实现零放电的有效技术。但是,几种挑战与将浆料注入地下形成的挑战相关。废物浆(WSI)中最常见的挑战)对于大多数现有WSI井的注射参数的工程设计差,由于WSI操作的较差,因此,注入的固体将使WSI损坏(包括骨折损坏)附近的WSI运行持续损失。对于WELMORE形成损坏(包括断裂损伤)。实时的实时持续操作的注射监测对于正确进行操作错误并调整注射参数是重要的,以确保良好的寿命。本文讨论了将注射率保持的注射监测和步骤所需的步骤进行健康的WSI操作。三种案例研究提出突出了C的操作在Eagle Ford,Haynesville和Permian Basin页岩的注射器中的一种显着的形成损伤发展。根据监测结果提供指南,根据监测结果提供浆液流变学,压力,注射策略等。这是有助于保持注射性。所提出的案例研究表明,与良好监测程序的井保持了其运作的过程,与其他井相比,它的运作过程越早失去了其注射。不同案例研究的结果用于制备一套可用于维护的准则注射性并延长井寿命。本文讨论了消除的技术,以避免在WSI操作期间避免导致形成损坏和良好插入的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号