A Methodological Workflow for Assessment and Design of a Huff-N-PuffHydrocarbon Gas Injection Pilot Test as an EOR Technique for Eagle FordShale Oil Reservoirs

机译:一种用于评估和设计的方法论工作流程,作为鹰队储物油储存器的EOR技术作为EOR技术的评估和设计

获取原文

摘要

Implementation of miscible gas huff and puff(HnP)for Improved Oil Recovery(IOR)requires timelyidentification of prospective projects,a demonstration of economic feasibility through pilot testing,andefficient scale-up of HnP operations.HnP pilot design and execution of the pilot project requires a minimumof 9 to 12 months to procure,and another 8 to 12 months to construct and operate.A substantial capitalinvestment,approximately $1 to $5 million per pilot well,is also required(Texas Railroad Commission &Industry Operators).The lead time for procuring specialized compression can require 9 to 15 months.Theseearly purchases comprise a large proportion of project capital investment.Collaboration by a variety of technical disciplines is required to efficiently design,construct,andoperate a pilot with the goal of expanding IOR operations.An effective,collaborative approach allows fordevelopment of a HnP design that integrates both subsurface and surface design criteria.A workflow for design of HnP pilot testing was developed to coordinate concurrent project effortsincluding completion of reservoir characterization,engineering,permitting,stakeholder review andapprovals,gas contracting,construction,testing and full-scale execution.Effective coordination of theseefforts will result in efficient project implementation with minimal impacts on project scope,schedule andcost.Use of the workflow also allows for timely identification and mitigation of multiple project risksassociated with design,construction and operation of IOR.Well executed pilot tests will accelerate the learning curve for application of HnP IOR in Eagle Fordwells;resulting in lower capital costs,lower operating costs,and increased operational reliability.Pilot testresults will also be used to up-scale IOR operations in a cost-effective manner.
机译:实施可混溶性气体和PUFF(HNP)进行改善的石油恢复(IOR)需要及时识别前瞻性项目,通过试验检测来证明经济可行性,中HNP运营的增速和执行试点项目的执行情况收购的最终需要9至12个月,另外8到12个月建造和运营。也需要大量资金投资,每次飞行员大约1美元至500万美元,也是必需的(德克萨斯铁路佣金和工业运营商)。采购专业的提前时间压缩可能需要9到15个月。从而包括大部分项目资本投资。通过扩大IOR运营的目标,需要有效地设计,建设的各种技术学科的各种技术学科.AN有效,协同方法允许开发HNP设计,该设计集成了地下和表面设计标准。设计o的工作流程F HNP试验测试是为了协调并发项目,努力完成水库特征,工程,允许,利益相关者审查和申请,天然气收缩,建设,测试和全规模执行。歧视物的有效协调将导致有效的项目实施,影响最低影响项目范围,安排安排和工作流程还允许及时识别和减轻多个项目的速度,其中包括IOR的设计,建设和运营.WELL执行的试点测试将加速在Eagle Fordwell中应用HNP IOR的学习曲线;导致降低资本成本,较低的运营成本和增加的运营可靠性.Pilot TestResults也将以经济高效的方式用于上调IOR操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号