首页> 外文会议>SPE International Conference and Exhibition on Health, Safety, Security, Environment, and Social Responsibility >Iraq Operations’ Five 5 Years Waste Management Blue Print to Manage Waste in Remote Environment of Garraf, Iraq Operations
【24h】

Iraq Operations’ Five 5 Years Waste Management Blue Print to Manage Waste in Remote Environment of Garraf, Iraq Operations

机译:伊拉克运营'五5年废物管理蓝色印刷,管理Garraf的远程环境中的废物,伊拉克运营

获取原文

摘要

Managing wastes in remote oil and gas operations for PETRONAS Carigali Iraq Holding B.V. in the field of Garraf, Iraq presents a multitude of challenges including unavailability of an approved waste disposal facilities, incompetent wastes management contractor and land acquisition issues requires PETRONAS to establish a Five Years Waste Management Blue Print. The objective of the blueprint is to provide strategic guidance for approaches in resolving the waste management issues in Garraf. Primary problem statement from the forecast of the cumulative impact of waste generation since day one of operation until the completion of Garraf Field Development Plan warrants the need of significant change in day to day waste management practices in Garraf. The method used in establishing this blue prints includes, eliminating and/or minimization of waste generation from source, optimizing each waste stream including reuse & recycle towards zero discharge and disposal through deployment of fit for purpose and green technologies which are environmental friendly. Additionally, PCIHBV also takes into consideration challenges of medium-skilled operator, support by stakeholder and authorities and environmental health impact. Since it has been launched in 2016, significant value creation identified as follows: 1. Support from host authority to invest on technology deployment. Host authority accepted and acknowledge the blue print and support by approving significant environment budget despite low oil price based on long term value gain. 2. Hazardous Waste Treatment and Disposal Prior to establishment of this blue print, all hazardous waste are stored in our HWS which will poses us to long-term liability due to mismanagement and integrity of the HW container. Various engagement and discussion were conducted between PCIHBV and host government to resolve this issue since 2016. PCIHBV established the contract with Ministry of Science and Technology (MoST) on hazardous waste treatment and disposal and being the first International Oil Company (IOC) in Iraq to establish as such contract. 3. Cost Saving/Optimization The implementation of the blue print produced some significant value creation which includes cost saving by reusing some of the waste and optimization of the raw material and resources e.g. Land acquisition for landfill area, disposal cost etc. 4. Capability development Development of local nationality on environmental technology and inculcate mindset change on the environmental awareness
机译:在Garraf领域举行BVARACAS Carigali伊拉克的远程石油和天然气运营中的浪费,伊拉克占据了多种挑战,包括批准的废物处理设施,无能的废物管理承包商和征地问题需要百年额外设立五年废物管理蓝色印刷品。蓝图的目的是为解决Garraf中的废物管理问题的方法提供战略指导。从一天开始的浪费生成累积影响预测的主要问题陈述,直到Garraf现场发展计划完成,以GARRAF的日常废物管理实践需要重大变化。建立该蓝色印刷品的方法包括,消除和/或最小化来自来源的废物产生,优化每个废物流,包括通过部署适合于环境友好的目的和绿色技术进行重用和再循环。此外,PCIHBV还考虑了中型技术操作员,利益攸关方和当局和环境健康影响的挑战。由于它已于2016年推出,因此确定的重大价值创建如下:1。主机权限支持投资技术部署。虽然基于长期价值收益的低价低廉,但仍可批准大量环境预算,仍可批准大量环境预算,承认并承认全国主机。 2.危险废物处理在建立这款蓝色印刷机之前,所有危险废物都存储在我们的HW中,由于HW集装箱的管理不善和完整性,我们将使我们带来长期责任。自2016年以来,PCIHBV和东道国政府之间进行了各种参与和讨论,以解决此问题.CCIHBV与科学技术部(MOST)在危险废物处理和处置以及伊拉克第一家国际石油公司(IOC)的合同。建立这些合同。 3.节省成本/优化蓝色印刷的实现产生了一些重要的价值创造,包括通过重用原材料和资源的一些废物和优化来节省成本节省。垃圾填埋场土地收购,处置成本等4. 4.环境技术本地国籍的能力发展,并灌输心态对环境意识的变化

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号