首页> 外文会议>International Conference on Industrial, Mechanical, Electrical, and Chemical Engineering >Analysis of Risk Factors Nonproductive Time on Geothermal Drilling in Indonesia
【24h】

Analysis of Risk Factors Nonproductive Time on Geothermal Drilling in Indonesia

机译:印度尼西亚地热钻探风险因素的危险因素分析

获取原文

摘要

This research analyzes nonproductive time (NPT) in geothermal drilling operations. In geothermal drilling operations, NPT can be caused by several factors, such as decision making factors, operational planning factors, geological factors, and equipment failure factors. This study was conducted in the three wells geothermal project at MKD location in Indonesia. Each operation and activity that causes nonproductive and down time rig will be recorded and counted as NPT. The data then be identified as the cause of NPT in drilling operations whether caused by decision making factors, operational planning factors, geological factors, or caused by failure factors of rig equipment. Analysis in this study used excel and montecarlo, and the results of the analysis get a comparison of the time between operation and NPT, probability of the factors causing NPT and the probability of the risk level of each factor causing nonproductive time. The results of the analysis will be used as a reference in risk mitigation in geothermal well drilling.
机译:该研究分析了地热钻井作业中的非生产时间(NPT)。在地热钻探作业中,NPT可能是由几个因素引起的,例如决策因素,运营计划因素,地质因素和设备故障因素。本研究在印度尼西亚MKD地点的三个井地热项目进行。将记录并计为NPT的每个操作和活动,导致非培养和下降时间钻机。然后,数据被识别为NPT在钻孔操作中的原因,无论是由决策因素,运营规划因素,地质因素还是由钻机设备的故障因素引起的。本研究中的分析使用Excel和Montecarlo,分析结果得到了操作和NPT之间的时间的比较,导致NPT的因素的可能性以及导致非培养时间的每个因素的风险水平的概率。分析结果将被用作地热钻井危险风险缓解的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号