首页> 外文会议>SPE Reservoir Characterisation and Simulation Conference and Exhibition >Green Field Development Workflow Involving Appraisal,Increased Scope,Optimizing Target Production And Reservoir Monitoring: A Case Study
【24h】

Green Field Development Workflow Involving Appraisal,Increased Scope,Optimizing Target Production And Reservoir Monitoring: A Case Study

机译:绿地开发工作流程涉及评估,范围增加,优化目标生产和水库监测:案例研究

获取原文

摘要

A novel workflow was developed to select an optimal field development plan (FDP) which accounts fora number of associated uncertainties for an oil Greenfield concession that has a limited number of wells,production data and information.The FDP was revisited and updated to address the additional data acquiredduring the field delineation phase.The study in Ref-1 demonstrates the comprehensive uncertainty analysis performed and the resultingoptimized FDP.The FDP was developed to minimize the economic risk and uncertainty.Further fielddelineation activities have revealed a north and south extensions with an increase in hydrocarbonaccumulation by 115%.A reservoir dynamic model was updated because of the increase in HC and inputdata from 17 wells.A workflow has been created with a suitable development option to consider the recently appraised areas,which are: 1.Updated saturation height functions (SHFs) which improve the match between newly drilledwells and water saturations logs.2.Updated reservoir models which were based on well tests and new analytical interpretations.3.History matching well test data with new acquisition data.4.Optimized field development options,that cover additional areas.5.Inputs to reservoir surveillance plan.Be implementing following an extensive analysis the most robust development concept was selected andwill now in the field.
机译:开发了一种新的工作流,选择最佳的现场开发计划(FDP),该计划概述了有限的井,生产数据和信息的石油绿地特许权的相关不确定性的数量。FDP被重新审视并更新以解决额外的数据acquiredduring领域划分相,研究Ref-1的展现了全面的不确定性分析执行和resultingoptimized FDP.The FDP的开发是为了尽量减少经济风险和uncertainty.Further fielddelineation活动已经揭示了南北扩展与增加碳氢化合物增加115%。储存器动态模型是更新的,因为HC和InputData从17洞口的增加。已经使用合适的开发选项创建了工作流程,以考虑最近评估的区域,即:1.Updated饱和度函数( SHFS)改善新钻井和水饱和度的比赛.2.Updated r基于井测试和新的分析解释的eServoir模型.3。使用新的采集数据匹配井测试数据.4.优化的现场开发选项,涵盖额外的区域.5.向水库监控计划进行额外的区域。在广泛的情况下实施分析现在选择了最强大的开发概念。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号