首页> 外文会议>Fertilizer Latin Americano >NIIK experience in construction of OSBL facilities as EPC project integral part of nitrogen complex in Tatarstan
【24h】

NIIK experience in construction of OSBL facilities as EPC project integral part of nitrogen complex in Tatarstan

机译:澳门省澳门织物的建设经验,作为EPC项目的氮斯坦氮综合体的组成部分

获取原文

摘要

Scope of works for OSBL seems to be not so effortful and time consuming as the one for ISBL during the project implementation, but Scope of works for OSBL NIIK performed on EPC basis for Urea/Ammonia/Methanol Complex at Ammoni in Tatarstan shows the opposite. Usually mentioning EPC project we mean ISBL only. We imagine highly expensive scope of supply for ISBL performed by world famous contractors and licensors accompanied by low- cost and insignificant OSBL made by a local engineering company. But if you analyze any project schedule you will see that the schedule phases for OSBL are the milestones for ISBL. The design complexity and the number of units and equipment items can be compared to those for ISBL. For example DM water unit or ammonia storage. The product cost and its quality directly depend on the solutions realized for construction of OSBL objects. The product lifecycle starts with energy resources and feedstock and finishes with delivery to the warehouse, storage, packaging and shipment. The plant staff know how significant OSBL is when we speak about delay of the product dispatch, water quality degradation or when product storage conditions are broken and the product is spoilt. We call new facility "a complex". A new production facility can be compared to a space complex being integral, comprehensive and elaborated. Except in a spaceship and a satilite, there are telemetry and communication control systems and many other units integrated in one system. And Russia is famous for both industries: space industry and production. Similar is for production. Production complex is not a number of plants located on one and the same site, it's harmony between ISBL and OSBL objects and an integrated comprehensive entity.
机译:对于OSBL的工程范围似乎并不是如此努力,并且在项目实施过程中对于ISBL来说并不是那么努力和耗时,但在塔塔坦氨基中的尿布/氨/甲醇复合物对EPC基础进行的作品的作用范围显示相反。通常提到EPC项目我们的意思只有。我们想象世界着名承包商和许可证的isbl伴随着由当地工程公司制造的低成本和微不足道的奥布尔表达的ISBL的高度昂贵的供应范围。但如果您分析任何项目计划,您将看到OSBL的时间表阶段是ISBL的里程碑。可以将设计复杂性和单位和设备数量与ISBL的设计进行比较。例如DM水部门或氨储存。产品成本及其质量直接取决于实现奥布尔对象建设的解决方案。产品生命周期从能源资源和原料开始,并在仓库,存储,包装和装运中饰面。工厂工作人员知道OSBL是多么谈论产品调度延迟,水质退化或产品储存条件破坏,产品被宠坏。我们称新设施“一个复杂”。可以将新的生产设施与空间复合体进行比较,整体,全面和阐述。除宇宙飞船和苜蓿外,还有遥测和通信控制系统以及许多集成在一个系统中的其他单元。俄罗斯以行业为名:太空工业和生产。类似的是生产。生产综合体不是一个位于同一站点的许多植物,它在ISBL和OSBL对象之间和综合综合实体之间的和谐。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号