首页> 外文会议>ISRM European Rock Mechanics Symposium >Investigation of Geomechanical Features of the Rock Mass in Mining of Two Contiguous Deposits under Tectonic Stresses
【24h】

Investigation of Geomechanical Features of the Rock Mass in Mining of Two Contiguous Deposits under Tectonic Stresses

机译:构造应力下两连续沉积矿井岩体地质力学特征研究

获取原文

摘要

The paper presents the results of research about the stress-strain state in the eastern part of the Khibiny massif (the Kola Peninsula, North-Western Russia) where the Niorkpahk and Oleniy Ruchey contiguous deposits are being mined by open technologies. There are plans to develop the Oleniy Ruchey deposit by underground methods in the near future. The underground mining operations will be restricted by protecting pillars because of nearby open-pits. High horizontal stresses and brittle rock have a significant influence on mining operations and indicate rockburst hazardous conditions. For estimating mutual influence of open-pit and underground mining in progress, the authors have designed a numerical geomechanical model which includes basic geological and mining-engineering factors. Based on the results of numerical modeling it has been found that the mutual influence occurs when underground mining reaches the rock mass under the open-pit. This conclusion suggests that the protecting pillars' boundaries can be revised for the purpose of the further decrease. This will increase volume of reserves mined and efficiency of underground mining.
机译:本文介绍了关于牛仔群岛(Kola Peninsula,西北西北俄罗斯西北俄罗斯)的压力 - 应力状态的研究结果,其中龙虾汤和奥莱尼·鲁奇连续矿床正在开放的技术开采。有计划在不久的将来通过地下方法开发Oleniy Ruchey存款。由于附近的开放式坑,地下采矿业务将受到保护柱的限制。高水平应力和脆性岩石对采矿业务产生了重大影响,并表明岩体危险条件。为了估算露天坑和地下采矿的相互影响,作者设计了一种数值地质力学模型,包括基本地质和挖掘工程因素。基于数值模拟的结果,已经发现,当地下采矿到达露天坑下的岩石质量时发生相互影响。这一结论表明,可以为进一步减少的目的修改保护柱的边界。这将提高储备储备量和地下采矿效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号