首页> 外文会议>SPE Hydraulic Fracturing Technology Conference and Exhibition >The World's First Offshore Multilateral Well Completed with Multistage Proppant Fracturing: A Case Study from Offshore Black Sea
【24h】

The World's First Offshore Multilateral Well Completed with Multistage Proppant Fracturing: A Case Study from Offshore Black Sea

机译:世界上第一个拥有多级支撑性压裂的海上多边良好,近海黑海的案例研究

获取原文

摘要

The paper aims to present the successful execution of the first offshore multilateral well completed for multistage high-pressure proppant stimulation - in the Black Sea, offshore Romania. The paper describes the drivers that lead the operator to trial a multilateral well as well as cover the considerations made in selecting, defining and executing the final completion solution with a review of the lessons learned. With only one platform slot left and a significant undrained area of reservoir the operator had to maximise the hydrocarbon recovery through a single well which, due to pressure to increase the operator's daily production, had to be finalised in just one year. Building on field experience gained since 2008 in drilling and completing for multistage proppant stimulation a detailed screening and evaluation of multilateral completion technologies was performed. The focus was on developing a concept that would minimise risks during execution while meeting cost and lead time objectives, which necessitated customising the chosen TAML Level 3 completion design and installation methodology. To maximise rig-time efficiency the well was executed in two phases: 1) drilling and lower completion installation of both branches with a drilling rig and 2) stimulation and upper completion installation with the platform's workover rig. With six stages in each lateral the high-pressure stimulation was executed by a converted supply vessel in four sailings, necessary to reload materials. To meet the delivery schedule, ensure simplicity and utilise operator experience the completion was realised with no dedicated multilateral hardware, rather, through the effective use of standard multistage stimulation open hole completion equipment and appropriately engineered bent joints to exit the main bore. With initial production rates higher than anticipated, the multilateral well completed in this manner has proven to be considerably more economic than drilling two horizontal wells with equivalent reservoir coverage. The success of this well serves as a proof of concept and provides increased confidence in delivering reliable, cost effective multilateral wells even under tight time constraints and in areas and/or operators with no history of multilateral well completions
机译:本文旨在提出成功执行为多级高压支撑剂刺激 - 在黑海,离岸罗马尼亚的第一个海上多边良好完成。本文介绍了导致操作员试验多边井的驱动程序,以及涵盖在选择,定义和执行最终完成解决方案时所做的考虑因素,并通过审查所吸取的经验教训。只有一个平台槽左侧和一个重要的储层区域,操作员必须通过单一的井来最大化碳氢化合物回收,这是由于增加了运营商日常生产的压力,必须在短短一年内完成。自2008年钻探和完成多级支撑剂刺激以来,建立现场经验进行了详细的筛选和评估多边完工技术。重点是开发一个概念,可以在满足成本和提前期目标时最小化执行期间的风险,这需要自定义所选择的TAML级别3完成设计和安装方法。为了最大化钻机时间效率,井在两阶段执行:1)钻孔和钻井平台的分支完成安装,并使用平台的工作台刺激和上部完成安装。在每个横向中,在四个航行中的转换供应容器中执行高压刺激,以重新加载材料。为了满足交付计划,确保简单和利用操作员体验完成完成,无需专用多边硬件,而是通过有效使用标准多级刺激开孔完成设备和适当的工程弯曲接头以退出主孔。由于预期的初始生产率,以这种方式的多边良好完成,已被证明比钻取两个水平井,并且具有相同的储层覆盖范围。这良好的成功是概念证明,即使在紧张的时间限制和区域和/或运营商中,也能够增加可靠,具有成本效益的多边井的更大的信心,并且在没有多边井完井历史

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号