首页> 外文会议>International Conference on Advances in Materials, Machinery, Electronics >Coal Mining with Triple-section Extraction Process in Stagger Arrangement Roadway Layout Method
【24h】

Coal Mining with Triple-section Extraction Process in Stagger Arrangement Roadway Layout Method

机译:交错布置巷道布局方法三段提取过程采煤

获取原文

摘要

This paper introduces the Triple-section extraction process in the three-dimensional roadway layout of stagger arrangement method for longwall top-coal caving mining. This 3-D roadway layout of stagger arrangement method without coal pillars, which arranged the air intake roadway and air return roadway in different horizons, realizing the design theory transformation of roadway layout from 2D system to 3D system. And the paper makes systematic analysis to the geological, technical and economic factors, applies this new mining roadway layout technology for raising coal recovery ratio and solving the problems about full-seam mining in thick coal seam synthetically according to theoretical study and mining practice. Furthermore, the paper presents a physical simulation about inner staggered roadway layout of this particular longwall top-coal caving method.
机译:本文介绍了长墙体顶煤矿井错开排列方法三维道路布局中的三段提取过程。这种无煤支柱的错位排列方法的3-D巷道布局,该方法在不同的视野中排列了进气道路和空气返回巷道,实现了从2D系统到3D系统的道路布局的设计理论转变。本文对地质,技术和经济因素进行了系统分析,适用于综合性研究和采矿实践综合研究煤炭回收率的新采矿道布局技术,解决了厚煤缝的全接缝采矿问题。此外,本文介绍了该特定长墙体顶煤崩落方法的内部交错道路布局的物理仿真。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号