A Value Driven Approach for Implementing a Simple and Low-Cost Natural Dump-Flood in an Offshore Environment: Lessons Learned from the First Successful Natural Dump-Flood in Malaysia

机译:在离岸环境中实现简单和低成本自然倾倒洪水的价值驱动方法:从马来西亚第一个成功的自然倾倒洪水中汲取的经验教训

获取原文

摘要

The first successful natural dump-flood in the Malaysian offshore environment provided numerous lessons learned to the operator. The minimal investment necessary for implementing the dump-flood coupled with the lack of recompletion opportunities in the subject wells suggested that direct execution without spending on expensive data gathering activity and extensive reservoir study makes more sense from a business point of view. A similar oil gain compared to a water injection project can be achieved at a significantly lower cost of USD 0.01 to 0.15 million in an offshore environment through dump-flooding. The existing oil producers in the depleted reservoirs in Field B were originally completed and successfully drained oil from in a high-pressured watered-out reservoir below, making it an ideal dump-flood water source. The dump-flood was initiated by commingling the target and water source reservoir through zone change, allowing water to naturally cross-flow into the pressure depleted target reservoir. Once a memory production logging tool (MPLT) confirmed the cross-flow, the offtake well was monitored to determine the impact of the dump-flood and produce once the pressure was increased. Minimal investment was necessary because the operations were executed using slickline. The reservoir model will be calibrated once the positive impact of dump-flood is realized in the offtake well. The first natural dump-flood in Reservoir X-2 has successfully produced 0.29 MMstb as of August 2018 with 600 BOPD incremental oil gain. The incremental recovery factor (RF) from the first dump-flood is predicted to be from 5 to 8%. Based on this success, it was decided to replicate the dump-flood project in other depleted reservoirs with Reservoir X-2 as an analog. Four reservoirs were subsequently identified, each with an estimated operational cost of approximately USD 0.01 million and potential incremental reserves of 0.10 to 0.20 MMstb per reservoir. The minimal investment necessary, the idle status of the wells and reservoirs, and the potential incremental reserves suggested that it is more appealing to proceed with implementing the dump-flood without undergoing an extensive and costly reservoir study. With reservoir connectivity being important to the success of dump-flooding, a more cost-effective approach would be to confirm the connectivity by monitoring the offtake well after the dump-flood is initiated. This approach provides more value because the cost of interference or pulse testing is significantly more expensive than the cost of the dump-flood itself while reservoir connectivity was already indicated as likely by geological data (map and seismic). Through a value driven approach, these dump-flood opportunities become more economically viable, allowing the operator to prolong the life of the assets and maximize the field profit. This paper discusses using a value driven and business approach to implement the dump-flood in a mature field. Valuable insight into the business and technical considerations of implementing dump-floods are described, which are relevant to the industry, especially in today's low margin business climate.
机译:马来西亚海上环境中的第一个成功的自然倾倒洪水为运营商提供了许多经验教训。实施倾销洪水所需的最小投资加上主题井中缺乏重新完成机会,建议直接执行,而不支出昂贵的数据收集活动和广泛的水库研究,从企业的角度来看更有意义。通过倾倒洪水,与注水项目相比,与水注射项目相比的油增益可以在离岸环境中以0.01至0.15亿美元的成本实现。现有的现有石油生产商在FIAL B中的耗尽储层最初完成并成功地从下面的高压浇水储层中排出油,使其成为理想的倾倒水源。通过将目标和水源储层通过区域变化来启动倾卸洪水,使水自然地交叉流入压力耗尽的目标储层。一旦内存生产测井工具(MPLT)确认了交叉流量,就会监测进度,以确定一旦压力提高,就会确定倾倒洪水的影响并产生。最小的投资是必要的,因为使用Slickline执行操作。一旦倾倒洪水的积极影响,储存器模型将被校准,在进入良好的情况下实现了倾倒洪水的积极影响。储层X-2中的第一个自然倾倒洪水已成功生产0.29mmstB,截至2018年8月,具有600个Bopd增量油增益。从第一个转储洪水中的增量恢复因子(RF)预计为5%至8%。基于这一成功,决定用储层X-2作为模拟复制垃圾泛滥项目。随后识别了四个水库,每个估计的运营成本约为0.01亿美元,每储层0.10至0.20mmstb的潜在增量储量。必要的最小投资,井和水库的空闲状态以及潜在的增量储备表明,在不经历广泛且昂贵的水库研究的情况下继续实施倾销洪水更具吸引力。随着水库连接对倾倒洪水的成功非常重要,更具成本效益的方法是通过在启动倾销洪水后监测进样品来确认连接。这种方法提供了更多的价值,因为干扰或脉冲测试的成本比倾倒洪泛自身的成本明显更昂贵,而储层连通性已经用地质数据(地图和地震)可能是可能的。通过价值驱动方法,这些倾销洪水机会变得更加经济可行,允许运营商延长资产的生命并最大限度地利用现场利润。本文讨论了使用价值驱动和业务方法来实现成熟字段中的转储洪水。描述了对实施倾销洪水的业务和技术考虑的有价值的见解,这与行业有关,特别是在今天的低利润商业环境中。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号