首页> 外文会议>SPE Oil and Gas India Conference and Exhibition >Efficient Horizontal Wellbore Placement and Completion with Geosteering and Zonal Isolation in a Reservoir on Waterflood: A Case Study of Western Offshore, India
【24h】

Efficient Horizontal Wellbore Placement and Completion with Geosteering and Zonal Isolation in a Reservoir on Waterflood: A Case Study of Western Offshore, India

机译:高效水平井筒放置和在水库水库中的地蹄齿和区域隔离完成 - 以印度西海岸的一个案例研究

获取原文

摘要

Infill drilling is an integral part of brown field management for exploiting un-drained areas with good oil saturation. In a matured field on water-flood, the primary objective is optimized wellbore placement of infill wells in areas with better petro-physical characteristics, bypassing flooded region. It is also important to design a robust completion strategy to safeguard the longevity of these wells by curtailing produced water. This approach assists in dramatic increase in production by isolating water charged sections and thereby restricting rise in water production. The use of advanced Logging-While-Drilling techniques during horizontal drilling provides an opportunity for effective well planning. Real-time Logging-While-Drilling instruments during directional drilling gives us the opportunity to acquire information pertaining to the reservoir in a single run. Interpretation from the real-time data acquisition boosts the planning during wellbore drilling. This paper discusses a case study of a field in western offshore, India, which focuses on the applications of geosteering and the use of swell packers for zonal isolation to augment oil production. In this study, two wells have been deliberated where the real-time information has been extracted and included in the decision making process. The bottom-hole assembly used in this case, comprised standard Logging-While- Drilling services such as gamma ray, resistivity, neutron porosity, density and density imaging services and also formation pressure testing. Since the field under study is a carbonate reservoir that has been on waterflood for the last twenty eight years, chances of early breakthrough of water in the infill wells has posed a high risk in spite of the presence of good bypassed oil saturation. Geosteering has enabled to restrict the horizontal section safely within the desired zone of better oil saturation and geological features, as interpreted from the Logging-While-Drilling data. Further isolation of suspected water bearing zones with swell packers have assisted in healthy well completion by diminishing chances of sharp rise in water cut in the infill wells.
机译:填充钻孔是棕色现场管理的一个组成部分,用于利用具有良好油饱和度的无排水区。在洪水的成熟领域中,主要目的是优化蜂窝井中的井筒放置在具有更好的石油物理特性的区域,绕过淹没区域。设计强大的完工策略也很重要,以通过减少生产的水来保护这些井的寿命。这种方法通过隔离带电部分,从而限制水生产的增加,有助于生产的显着增加。在卧式钻井期间使用高级伐木钻孔技术为有效井规划提供了机会。定向钻井期间的实时钻井仪器让我们有机会在一次运行中获取与水库有关的信息。从实时数据采集解释提高了井筒钻井期间的规划。本文讨论了印度海滨西海岸田野的案例研究,专注于地统治性和使用膨胀包装机的应用,以增加石油生产。在这项研究中,已经刻想了两个孔,其中提取实时信息并包括在决策过程中。在这种情况下使用的底部孔组件包括标准的伐木服务,例如伽马射线,电阻率,中子孔隙度,密度和密度成像服务以及形成压力测试。由于研究的领域是过去二十八年的碳酸盐储层,在过去的二十八年中一直在水料,仍然在填充井中的水中的早期突破,尽管存在良好的旁路油饱和度,但仍然提高了高风险。由于从钻井间数据的解释,Geoderizing已经启用了将水平部分安全地限制在更好的油饱和度和地质特征的所需区域内。通过膨胀封装器的疑似水带区的进一步分离通过减少填充井中的水中急剧上升的可能性来辅助健康的井完成。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号