SURFACE FACILITIES OF THE TEMPA ROSSA PROJECT

机译:Tempa Rossa项目的表面设施

获取原文

摘要

The Tempa Rossa Project is a partnership project between Total, Shell and Mitsui, The Project development consists of various plants located in different areas; in particular an Oil Centre with process units and utilities for the treatment and stabilization of 50,000 barrels/day of Crude Oil and the treatment of the relevant water and gases, a LPG centre for the storage and export of LPG (240 ton/day), six Wellsites, the Corleto tie-in for the connection with the flowlines of the Snam Rete Gas network for the export of 230,000 m3 of gas/day and a pipeline for the transfer of the Crude Oil to the ENI refinery in Taranto. The Project is being developed in a complex context in a mountainous and rural environment, with harsh climatic conditions in winter time, with difficult logistical access, in local socio-economically sensitive conditions and where the level of external infrastructure is limited in relation to the extent of the works to be executed and the construction schedule. The Ready for Oil Production Date of the Project is scheduled for the 31st December 2017.
机译:TEMPA ROSSA项目是总,壳牌和三井之间的伙伴关系项目,项目开发包括位于不同地区的各种工厂;特别是一个具有工艺单元和公用事业的油中心,用于治疗和稳定5万桶/天原油和治疗相关水和气体,LPG储存和出口的LPG中心(240吨/天),六个营业癖,Corleto绑定了与稳定的气体网络的流动线,用于出口230,000 M3的燃气/天和管道,用于将原油转移到塔兰托的ENI炼油厂。该项目正在在山区和农村环境中在一个复杂的背景下在冬季的气候条件下,在当地社会经济敏感条件下具有困难的后期,难以进行后勤访问,以及外部基础设施的水平有限的关系要执行的作品和施工时间表。该项目的准备就绪计划于2017年12月31日预定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号