首页> 外文会议>SPE Annual Caspian Technical Conference and Exhibition >Managing Operational Challenges to Fulfill Reservoir Management Objectives in Surface Facility Constrained Environment
【24h】

Managing Operational Challenges to Fulfill Reservoir Management Objectives in Surface Facility Constrained Environment

机译:管理业务挑战,以满足地面设施受限环境中的水库管理目标

获取原文

摘要

Sour gas injection(SGI)pilot was successfully implemented in Tengizchevroil(TCO)in 2008,successfully achieving pressure maintenance in Tengiz platform,re-injecting gas with high H2S concentration and improving oil recovery within pilot area.Over the years,gas breakthrough and GOR increase has been observed in majority of producers in SGI pattern.Due to limited surface gas handling capacity,producing SGI pattern wells with elevated GOR and H2S has been a challenge.At the same time,it is critical to manage voidage replacement ratio in the pilot area to maintain sufficient miscible gas sweep and ensure enough pressure release.Inability to inject all the sour gas to the reservoir leads to equivalent oil production cut at the Plant.Specialized SGI Operating Strategy has been in place since the commencement of the project with the aim of developing broader understanding of injected gas front evolution and operating the SGI Pilot in a way to maximize value for TCO by balancing between maximizing lower GOR/H2S front-end plant production vs.maintaining sufficient well injectivity.The production and injection well targets and surveillance activities were tailored towards fulfilling these strategic objectives.The operating strategy has been revisited several times to ensure appropriateness to business needs at any given time.Specialized reservoir simulation model is utilized for short and long-term injection forecasts to develop plans to provide sufficient well injection capacity at any given time.This paper will discuss challenges and best practices associated with(1)operating elevated GOR/H2S wells in a gas constrained environment while performing reservoir data acquisition program in highly congested area to fulfill SGI pilot objectives and(2)finding the trade-off between front-end plant production and injection goals.
机译:酸性气体注入(SGI)试点Tengizchevroil(TCO)的顺利实施,2008年,成功地实现吉兹平台压力维护,重新注入气体的高浓度H2S和改善试点中石油采收率area.Over这些年来,气突破和GOR增加,在多数SGI pattern.Due到有限的表面气体处理能力生产者已经观察到,生产SGI图案井用升高的GOR和H2S已经challenge.At同时,重要的是在所述导频来管理空隙率置换率区域保持足够的混溶气体吹扫,并确保有足够的压力release.Inability注入所有的酸气储层导致油当量减产在Plant.Specialized SGI经营战略,因为该项目的启动,其目的已经到位发展中注入气体前进化的更广泛的理解和maximiz之间平衡的方式操作SGI试点为TCO最大化价值ING低GOR / H2S前端厂生产vs.maintaining足够好injectivity.The生产和注入井的目标和监视活动都以实现这些战略objectives.The的操作策略定制已经被重新几次,以确保适当性的业务需求在任何给定time.Specialized储层模拟模型被用于短期和长期注射预测制定计划,以提供在任何给定time.This纸足够井注入能力将讨论(1)操作提升GOR / H 2 S的孔相关联的挑战和最佳做法在燃气有限的环境,而在高度拥挤的区域中执行储数据采集程序履行SGI导频目标和(2)发现前端植物生产和注入目标之间的折衷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号