首页> 外文会议>SPE Annual Caspian Technical Conference and Exhibition >Case Study of First Directional Hole Enlargement While Drilling with Closed Preventer
【24h】

Case Study of First Directional Hole Enlargement While Drilling with Closed Preventer

机译:用闭合预防钻探第一定向孔扩大的案例研究

获取原文
获取外文期刊封面目录资料

摘要

The Western Build-up area of the Karachaganak field(operated by Karachaganak Petroleum Operating b.v.-KPO b.v.)brought such new challenges to the project as drilling subhorizontal in narrow mud weight window,unmanageable mud losses,and formation fractures.With reference to the loss of circulation on offset vertical wells drilled in the Former Soviet Union(FSU)in this area,it is anticipated that the loss zone may not be cured by conventional remedial actions such as pumping LCM,cement or gunk.The uncontrollable lost circulation in the target reservoir induced to implement the special techniques for further development of the field.The pressurized mud-cap drilling,also known as Closed Hole Circulation Drilling(CHCD)is not new at the Karachaganak filed.Several years ago,”drilling without returns”was successfully introduced in the field,but a rotating control device(RCD)was employed to drill blind without directional control of the well.For KPO b.v.it was very important to deliver the horizontal well to maximize reservoir contact,optimizing potential for high rate production while minimizing drawdown.For a directional drilling service provider,it was critical to be sure that the technologies would adapt for drilling in such environment.Aggressive attention and composed approach were required for planning wells with RSS(Rotary Steerable System),MWD(Measurements-While-Drilling)and LWD(Logging-While-Drilling)equipment as the performance of those tools in a CHCD environment was influenced by different challenges in terms of data transmission(mud pulse telemetry),steerability,hydraulics and maintenance.To improve drilling efficiency,operator together with service companies worked closely to implement significant BHA and Bit design changes.Using an integrated drill bit design platform and dynamic system analysis,engineering team simulated the downhole environment and evaluated the possible behavior of the Bit,Hole Opener and bottom hole assembly(BHA)in hard formation.At the preparation stage,close attention was given also to the bending stress analysis due to expected DLS 4-8deg/30m as prevention action from possible damage and fatigue of the drill string components.First time worldwide the underreaming while drilling from the 6 ? to the 8-inch size,in a build-up section in a CHCD mode,was successfully delivered due to significant adjustments to the drilling practices and technologies modification.The proposed paper will review the recent results of the first directional hole enlargement job in a CHCD mode,special approaches that can be used in CHCD environments and share best practices in well planning and execution of similar wells.
机译:在卡拉恰甘纳克场(由卡拉恰甘纳克石油作业BV-KPO BV操作)的西部建成区带来了这样的新挑战,以项目为在钻井泥浆窄窗重量近水平,难以管理的泥浆漏失,并形成fractures.With参照损失在这一领域中钻前苏联(FSU)偏移垂直井流通,但预计损失区可以不通过传统的补救措施进行固化,如抽LCM,水泥或gunk.The不可控的漏失目标水库诱发以实现对field.The加压泥浆帽钻井,也被称为闭孔循环钻机(CHCD)的进一步发展专项技术是不是在卡拉恰filed.Several年前新“,没有回报钻”被成功在现场介绍,但是旋转控制装置(RCD)被用于钻盲而不well.For KPO BVIT的方向控制递送掘是非常重要宗塔尔以及最大化储集层接触,高速率的生产优化潜力,同时最大限度地减少drawdown.For定向钻井服务提供商,这是可以肯定的,该技术将适应于这种environment.Aggressive关注和组成方式钻井的关键是需要规划与RSS(旋转导向系统),MWD(测量随钻)和随钻测井(测井随钻)设备,这些工具在CHCD环境性能井是在数据传输方面(不同的挑战泥浆脉冲的影响遥测),可操控性,液压和maintenance.To提高钻井效率,以服务企业经营者一起密切合作,落实显著BHA和位设计changes.Using集成钻头设计平台和动力系统的分析,工程队模拟井下环境和评估该位的可能行为,开孔器和在硬formation.At井底组件(BHA)在p赔偿阶段,密切注意也给予弯曲应力分析,由于预期DLS 4-8deg /30米作为从钻柱components.First时间可能损伤和疲劳全球扩孔预防作用,同时从6钻?到8英寸大小,在一个CHCD模式积聚节,已成功交付,由于对显著调整modification.The提议的文件将审查第一定向孔扩大工作的近期疗效钻井实践和技术CHCD模式,可以在CHCD环境和分享最佳做法以及规划和类似井的执行中使用特殊的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号