首页> 外文会议>International Symposium on Submerged Floating Tunnels and Underwater Tunnel Structures >Experimental study on grouting foundation treatment of immersed tunnel
【24h】

Experimental study on grouting foundation treatment of immersed tunnel

机译:浸没隧道灌浆基础处理的实验研究

获取原文

摘要

Grouting method is one of foundation treatment methods of immersed tube tunnel, it has good effects on improvement of foundation strength and control of settlement deformation, but there is no mature method yet available for the determination of key technical parameters of foundation treatment by pressure grouting method and for the inspection and assessment of effects of treatment by pressure grouting method of immersed tube tunnel. In response to this problem, through model test, the influences of gradient, roughness, etc. of cushion layer of immersed tube tunnel on the effects of foundation treatment by pressure grouting method are researched and the method for inspection of effects of foundation treatment by pressure grouting method of immersed tube tunnel is proposed. The results show that: the changes of parameters of cushion layer regularly affect the effects of grouting by pressure grouting method and shall be considered in the design; the method combining ground penetrating radar and surface wave detection can effectively inspect the effects of foundation treatment.
机译:灌浆方法是浸入管隧道的基础处理方法之一,它对改进基础强度和沉降变形的控制具有良好的影响,但没有成熟的方法,可用于通过压力灌浆方法测定基础处理的关键技术参数浸法管隧道压力灌浆方法的检验与评估。响应于这个问题,通过模型试验,研究了浸入管隧道垫层垫层垫层梯度,粗糙度等对压力灌浆方法的影响的影响,以及压力检查基础处理效果的方法提出了浸入管隧道的灌浆方法。结果表明:缓冲层参数的变化定期影响压力灌浆方法灌浆的影响,在设计中考虑;结合地面穿透雷达和表面波检测的方法可以有效地检查基础处理的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号