首页> 外文会议>SPE Russian Petroleum Technology Conference >Integrated Optimization as a Way to Increase the Project Value on the Example of the Achimov Deposits Development Evaluation
【24h】

Integrated Optimization as a Way to Increase the Project Value on the Example of the Achimov Deposits Development Evaluation

机译:集成优化作为提高项目价值的方法,以提高Achimov存款开发评估的示例

获取原文

摘要

Integrated optimization,as an approach,is based on multivariate hydrodynamic modeling,the application of probabilistic methods,the application of game theory to the search for sustainable solutions,the identification of optimization problems at all stages of project evaluation.The application of game theory approaches allows us to formalize the problems associated with optimization at the stage of geological evaluation,selecting a rational geological program.The application of the probabilistic approach makes it possible to increase the cost by reducing the risk capital,determining rational exit conditions from the project and applying the technological limit.This approach is applicable for different levels of complexity of models,because it is a combination of integrated models and iterative stages,which ultimately allows you to determine the global optimal solutions.Within the framework of the approach,problems such as constructing a probabilistic hydrodynamic model,taking into account the technological limit when choosing a well design,determining rational conditions for exiting a project,interrelating an exploration program and selecting a development system are solved for the first time.The paper describes the approach and methodology of integrated optimization,which allows to increase the value of projects.The approach is considered on the example of analysis and evaluation of projects for the development of a number of deposits with Achimov deposits.
机译:综合优化,作为一种方法,是基于多变量流体动力学建模,应用概率方法,将博弈论的应用到寻求可持续解决方案,识别项目评估的所有阶段的优化问题。博弈论方法的应用允许我们将与地质评估阶段的优化相关联的问题,选择合理的地质计划。概率方法的应用使得可以通过减少风险资本来提高成本,从项目中确定Rational退出条件并申请技术极限。本方法适用于模型的不同程度的模型,因为它是集成模型和迭代阶段的组合,最终允许您确定该方法的框架,构造等问题,如构造的问题概率的流体动力学模型,进入Accou NT技术限制在选择井设计时,第一次确定退出项目的合理条件,相互关联探索计划并选择开发系统。介绍了集成优化的方法和方法,允许增加项目的价值。关于亚艾级职业沉积物开发多项存款的分析和评估的例子。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号