首页> 外文会议>International Conference on Electrical Engineering and Automation >Reliability Evaluation of Parallel Redundancy Protocol Based Substation Process Bus
【24h】

Reliability Evaluation of Parallel Redundancy Protocol Based Substation Process Bus

机译:基于并联冗余协议的变电站处理总线的可靠性评估

获取原文

摘要

IEC 62439 defines the parallel redundancy protocol (PRP) which offers zero disruption time for network communication. This paper evaluates the reliability of PRP based substation process bus considering protection functions. Two typical process bus solutions are discussed for a typical transmission substation. To reduce the calculation complicity, the approximation algorithm of reliability evaluation is presented based on the direct disjoint algorithm of the minimal cut sets. An example for the bus protection is given to demonstrate the approximation algorithm. The comparison results show that the presented analysis method is simple and efficient for engineering system. Finally, the reliability and availability of the protection system architectures based on the two process bus solutions have been compared and some suggestions have been given for the application of process bus.
机译:IEC 62439定义了并行冗余协议(PRP),其为网络通信提供零中断时间。 本文考虑了考虑保护功能的基于PRP的变电站过程总线的可靠性。 讨论了两个典型的处理总线解决方案以进行典型的传输变电站。 为了降低计算共同性,基于最小切割集的直接脱节算法来呈现可靠性评估的近似算法。 给出了总线保护的示例来展示近似算法。 比较结果表明,呈现的分析方法对于工程系统简单而有效。 最后,已经比较了基于两个过程总线解决方案的保护系统架构的可靠性和可用性,并且已经给出了用于应用程序总线的一些建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号