Environmentally friendly replacement of mature 200MW coal-fired power blocks with 2 boilers working on one 500MW class Steam Turbine Generator (2on1 unit concept)

机译:环境友好的成熟200MW燃煤电源块,2个锅炉工作在一个500MW级汽轮机发生器(2on1单元概念)

获取原文

摘要

A fleet of 200MW-class steam power plants runs with low efficiency and increasing maintenance cost. In case of Poland that fleet constitutes approx. 30% of the conventional generation. Utilities are obliged either to invest in sophisticated flue gas cleaning systems or to decommission those units, soon. A recently developed concept of 2on1 unit presented in the paper gives an answer to this owners’ dilemma. The efficiency level needs to be as high as possible but at least covering the new OECD rules that require Ultra Super Critical (USC) steam conditions. Raising the level from 34% to well above 43% reduces CO2 emissions by more than 20% as a contribution to the 2°C climate target that was decided in Paris in December 2015. New power plants are flexible to balance out the constantly increased renewable fraction of electric power which is unpredictable by its nature. Therefore primary and secondary frequency control, fast load ramps and low part loads become essential. Finally the economic value shall be given by reduced costs for the replacement. For low land consumption that is a benefit for environment, budget and related schedule. Old facilities can be upgraded with advanced components using the available infrastructure such as el. grid connection, coal handling, existing buildings, ash handling and cooling systems while keeping available permits. Summarizing from an aged 2x200MW-class SPP a state of the art 1x500MW-class power plant with outstanding flexibility and efficiency arises. Rafako as Boiler Manufacturer, Energoprojekt Katowice as Plant Engineering Company and Siemens as Steam Turbine Generator Manufacturer introduce their joint concept.
机译:一支200mW级蒸汽发电厂的队列以低效率和增加的维护成本运行。在波兰的情况下,舰队构成了大约。常规一代的30%。公用事业公司不得不投资复杂的烟气清洁系统或即将停用这些单位。本文呈现的最近开发的2on1单元的概念给出了这位所有者困境的答案。效率水平需要尽可能高,但至少涵盖了需要超超级关键(USC)蒸汽条件的新经合组织规则。将34%的水平提高到高于43%的水平将二氧化碳排放量减少了20%以上的二氧化碳排放,作为对2015年12月在巴黎决定的2°C气候目标的贡献中。新的电厂是为了平衡不断增加的可再生能源而灵活电力的一部分因其性质而不可预测。因此,初级和二次频率控制,快速载荷斜坡和低部件负载变得必不可少。最后,通过减少更换成本,应当给予经济价值。对于低土地消费,这是环境,预算和相关计划的好处。可以使用EL等可用的基础架构使用高级组件升级旧设施。网格连接,煤炭处理,现有建筑,灰烬处理和冷却系统,同时保持可用许可。总结了1倍的2x200MW-Class SPP现有技术的最佳发电厂,产生了出色的灵活性和效率。 Rafako作为锅炉制造商,Energoprojekt Katowice作为植物工程公司和西门子作为蒸汽轮机发电机制造商介绍了他们的联合概念。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号