Establishing Proper Abandonment and Site Restoration Strategy to ReduceUncertainty in Developing Mature Offshore Field: A Case Study of ONWJField in Indonesia

机译:建立适当的遗弃和现场恢复策略在开发成熟海上探测中的衰退 - 以印度尼西亚围际田野为例

获取原文

摘要

Abandonment and site restoration (ASR)is one of the responsibilities of Oil and Gas Company for thecountry where it operates.The ASR covers plug and abandon (P&A)of wells and dismantling of surfaceequipment in order to restore the environment as close as possible to its original state.Current practices in Indonesia's oil and gas business does not put P&A as one of the top priorities,compared to other engineering aspects in petroleum engineering.Therefore,P&A is sometimes regardedas a formality.A case study where long term oil and gas exploration and production with unique rock mechanics inOffshore North West Java (ONWJ)Area has caused subsidence and inherently leading to both productionoperation and well integrity issues.Several issues namely casing deformation and detachment from maincasing strings have been observed and is likely to put harm to oil and gas production in ONWJ Area.Casingissues such as buckling and crumpling,as well as the presence of micro cracks will present complicationsin safely plugging and abandoning the affected wells.Recommendations based on current practices around the world as well as mitigation solutions done inONWJ Area such as mechanical stress and/or strain release combined with well condition evaluation andmonitoring is maximized as an input to properly design safe and cost efficient P&A strategy for complex,marginal,and offshore wells with integrity issues.This research is aimed to become a benchmark for futureuses of P&A not only in ONWJ area but also in Indonesia.
机译:遗弃和现场恢复(ASR)是石油和天然气公司的责任之一,它是它运作的。asr覆盖了井的插头和放弃(p&a)的井和拆除了surfaceequipment,以便尽可能接近地恢复环境与石油工程中的其他工程方面相比,印度尼西亚石油和天然气业务的原始态度并没有将P&A作为最重要的优先事项之一。因此,P&A有时候是一个形式的案例研究,长期石油和天然气勘探用独特的岩石力学生产,在offoffshore西部爪哇(Onwj)地区已经沉降,并固有地导致生产工具和良好的诚信问题。已经观察到壳体的变形和脱落,并且可能会对石油造成伤害onwj地区的天然气生产。弯曲和皱折,以及微裂缝的存在,以及微裂缝的存在Tionsin安全堵塞和放弃受影响的井。根据世界各地的当前实践以及减缓解决方案的减缓解决方案,如机械应力和/或应变释放的缓解解决方案,与井条件评估和监测最大化为适当设计安全的输入。具有诚信问题的复杂,边缘和海外井的成本高效的P&A策略。本研究旨在成为P&A的未来的基准,而不仅在纽约州地区,而且在印度尼西亚。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号