首页> 外文会议>SPE/IATMI Asia Pacific Oil Gas Conference and Exhibition >Evaluation of the First Cycle of Steam Stimulation in North Kuwait Heavy Oil Thermal Pilots
【24h】

Evaluation of the First Cycle of Steam Stimulation in North Kuwait Heavy Oil Thermal Pilots

机译:北科威特重油热飞行员蒸汽刺激第一循环评价

获取原文

摘要

There are two ongoing steamflood pilots with inverted five-spot, 5-acre and 10-acre spacing patterns in North Kuwait heavy oil field. KOC determined that performing two or three Cycle Steam Stimulation (CSS) cycles followed by steamflood is required to achieve the production target from a multi-layer reservoir with two vertically separated heavy oil zones. A previous reservoir simulation study identified two possible completion strategies. One completion strategy for simultaneous steaming in the 5-acre spacing pattern and the other completion strategy for steaming one zone at a time in the 10-acre well spacing pattern. In this paper, we discuss for the two pilots, operational and monitoring challenges and the substantial difference in the performance after first CSS cycle for the two well completion strategies. The Steamflood pilots are currently at the pre-flood stage and the first cycle of the Cyclic Steam Stimulation (CSS) has been finalized. A comprehensive reservoir and well surveillance program is being conducted to monitor and gather data necessary to better understand the reservoir and well performance in the pilots. One of the goals of the pilots is to use the acquired reservoir understanding to determine a completion strategy for commercial development of the field from two options identified in the reservoir simulation study. This paper presents insights on the difference in the performance with the two well completion strategies. The first CSS cycle in the wells with 10-acre spacing and the completion strategy for steaming one zone at a time demonstrated relatively better performance compared to the wells in the 5-acre pilot with a completion strategy for simultaneous steaming where more challenges were observed. The reservoir properties and field surveillance data were used to explain this performance difference for the two well completion strategies after first cycle of CSS. The recommendations and conclusions in this paper are based on actual field data in a multi-layered heavy oil reservoir after the first CSS cycle. Future papers will present the results after further CSS cycles and steam flooding.
机译:北科威特重油场中有两个持续的蒸汽飞行员,倒五点,5英亩和10英亩的间距图案。 Koc确定执行两种或三个循环蒸汽刺激(CSS)循环,然后是蒸汽灌注物,以实现具有两个垂直分离的重油区的多层储存器的生产靶标。以前的水库仿真研究确定了两种可能的完成策略。在5英亩间距模式中同时蒸汽的一个完井策略以及10英亩间距井间隔模式的时间蒸一区的其他完井策略。在本文中,我们讨论了两家飞行员,运作和监测挑战,以及在初始完井策略后第一个CSS周期后性能的实质性差异。蒸汽灌木飞行员目前处于预洪水阶段,并且最终确定了循环蒸汽刺激(CSS)的第一个循环。正在进行全面的水库和井监督计划,以监测和收集更好地了解水库和飞行员良好性能所必需的数据。飞行员的目标之一是利用所获得的水库了解,从储层模拟研究中确定的两种选择确定了该领域商业发展的完工策略。本文介绍了两种完井策略表现差异的见解。在具有10英亩间距的井中的第一个CSS循环和一次蒸地区蒸一个区域的完井策略表现得比5英亩飞行员中的井相比具有与同时蒸汽同时蒸汽的完井策略。水库属性和现场监测数据用于解释在CSS的第一次循环后两种井完井策略的这种性能差异。本文的建议和结论是基于在第一个CSS循环之后的多层重油储层中的实际现场数据。未来的文件将在进一步的CSS循环和蒸汽洪水之后呈现结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号