1. Licence from PPC, Concept works with: 1.1. 2 Pelton, each 2.5 MW, 1.2. 4-10 Pumps, more pumps better for start up but more expensive, 1.3. Total 5.1 MW pumping power, 1.4. Concept fullfill also the requested cycle efficiency. 2. Water hammer calculations show that a system without surge tank or air vessel is possible. 3. Additional flywheel mass for the pump system is necessary to avoid cavitation. 4. For all scenarios without hydraulic shortcut for the GRP-Pipe PN40 and for steel pipes and valves (pumps, turbines …) PN63 is sufficient.
机译:1. PPC许可,概念适用于:1.1。 2个佩尔顿,每个2.5兆瓦,1.2。 4-10泵,更多泵更好,但更昂贵,1.3。总5.1兆瓦泵浦电源,1.4。概念血换也是所要求的循环效率。 2.水锤计算表明,没有电涌罐或空气容器的系统是可能的。 3.泵系统的额外飞轮质量是必要的,以避免空化。 4.对于没有GRP管PN40和钢管和阀门(泵,涡轮机...)PN63的所有场景都足够了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号