首页> 外文会议>Hydrovision International >HYDROVISION 2017 –DENVER, COLORADO, USA DESIGN CONSIDERATIONS FOR THE CAPILANO ENERGY RECOVERY FACILITY AND BREAK HEAD TANK (PPT)
【24h】

HYDROVISION 2017 –DENVER, COLORADO, USA DESIGN CONSIDERATIONS FOR THE CAPILANO ENERGY RECOVERY FACILITY AND BREAK HEAD TANK (PPT)

机译:Hydrovision 2017年 - 德国竞争,科罗拉多州,美国设计考虑Capilano能量回收设施和断线坦克(PPT)

获取原文

摘要

The Capilano Break Head Tank is located at the Capilano reservoir in North Vancouver and provides a controlled terminus for the Treated Water return tunnel from a new filter plant at Seymour reservoir to its origin at Capilano. The facility is designed to dissipate the pressure from the gravity fed tunnel prior to discharge into the Capilano supply main, and act as a stable head pond for the potable water distribution system for the City of Vancouver. An energy recovery hydro-turbine was installed to generate electrical energy to displace load at the adjacent pump station. Design considerations for the facility and the energy recovery turbine are discussed in this paper.
机译:Capilano Break头坦克位于北温哥华的Capilano水库,为治疗水返回隧道从Seymour Choperoir的新过滤器隧道提供了一个受控的终结,以其在Capilano的起源。该设施旨在在排放到Capilano供应主线之前从重力喂养隧道的压力消散,并充当温哥华市饮用水分配系统的稳定头池。安装了能量回收水轮机以产生电能以在相邻的泵站移动负载。本文讨论了设施和能量回收涡轮机的设计考虑因素。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号