首页> 外文会议>SPE Abu Dhabi International Petroleum Exhibition Conference >History Matching of Integrated Reservoir Simulation Model for Green Field Offshore Abu Dhabi
【24h】

History Matching of Integrated Reservoir Simulation Model for Green Field Offshore Abu Dhabi

机译:历史匹配综合储层仿真模型的绿地陆上阿布扎比

获取原文

摘要

Integrated reservoir simulation model (IRSM) is a common working tool in multidisciplinary teams nowadays. Usually such models constructed and used before field production startup, on the pre-project stage. But authors are commonly missing part about how good is the prediction ability of the model after first production and pressure data acquired? History matching, calibration of all parts of integrated model (reservoir, well, surface pipelines) requires constant efforts of multidisciplinary team or even building new model from scratch. In the scope of the paper the preparation of dynamic integrated reservoir simulation model and calibration based on 2 years of Phase 1 field production is covered. Commercially available reservoir simulator with fully coupled network infrastructure was used for modeling purposes. Multi-reservoir static model grid was linked with networks (oil production, gas and water injection). Real time data from well downhole gauges (including smart wells) and MPFMs were used for reservoir models HM. Additional data from surface gauges and export meter were used to calibrate pressure drop in wellbore and surface pipelines. Initially created IRSM was not able without HM stage and calibration to accurately predict the reservoir performance and pressure in the surface production system. Exceeding complexity of the model was decreasing the accuracy of the forecast even more. Only after history matching step for all wells using daily pressure/rate data and implementation of real pipeline layouts, the model was used for different purposes such as well placement and business planning. Highly efficient prediction tool was constructed in the scope of the study.
机译:集成的储层模拟模型(IRSM)是现在多学科团队中的一个常用工具。通常在Preplet Project Startup之前构建和使用的这种模型,在预先开发阶段。但是作者通常缺少部分关于在获取的第一个生产和压力数据之后模型的预测能力有多好?历史匹配,集成型号(储层,井,表面管道)的所有部分的校准需要多学科团队的不断努力,甚至可以从头开始建立新模型。在纸张范围内,涵盖了基于2年的第1期现场生产的动态集成储层仿真模型和校准。商业上可获得的具有完全耦合网络基础设施的储存器模拟器用于建模目的。多水库静态模型网格与网络相关联(石油生产,燃气和注水)。来自井下仪表(包括智能井)和MPFMS的实时数据用于储层模型HM。表面仪表和出口仪表的其他数据用于校准井筒和表面管道的压降。最初创建的IRSM无法无HM阶段并校准,以准确地预测表面生产系统中的储层性能和压力。超过模型的复杂性正在降低预测的准确性。仅在历史匹配步骤匹配所有井使用每日压力/速率数据和实际管道布局的实现时,该模型仅用于不同的目的,例如井放置和业务规划。高效的预测工具是在研究范围内构建的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号