首页> 外文会议>International Mine Water Association Congree >Development and installation of an underground measurement technique at the pilot mine 'Auguste Victoria' for a mid- to long-term monitoring of the mine water level rise
【24h】

Development and installation of an underground measurement technique at the pilot mine 'Auguste Victoria' for a mid- to long-term monitoring of the mine water level rise

机译:在飞行员“Auguste Victoria”的地下测量技术的开发和安装在矿山水位上升的中期长期监测

获取原文

摘要

Monitoring mine water level rise in a coal mine after its closing is an important issue. Therefore, a measurement technique will be established in the mine to provide direct and continuous recordings of different measured parameters. The development and installation of such an underground measurement data logging system for short- and long-term observation of the mine water level rise at the mine "Auguste Victoria" (Germany, Marl) allows to gain in situ measurement data. This information leads to a better understanding of the mine water level rising process.
机译:在结束后监测矿井水位在煤矿中升高是一个重要问题。因此,将在矿井中建立测量技术,以提供不同测量参数的直接和连续记录。这种地下测量数据测井系统的开发和安装,用于矿山“奥古斯特维多利亚州”(德国,Marl)的矿井水位上升的短期和长期观察,允许进入原位测量数据。这些信息导致更好地了解矿山水位上升过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号