Managing a change in rock mass response to mining at the Frog's Leg underground mine

机译:管理岩石大众响应的变化对青蛙腿地下矿井矿山

获取原文

摘要

Evolution Mining's Frog's Leg underground mine experienced an increase in the number of seismic events and rockburst occurrences during 2015. This was due to increased stress levels due to increasing mining depth and unfavourable mining geometry (mining the sole remaining diminishing pillar) as well as interaction with some seismically active crosscutting geological structures. At the time, the extraction sequence was transitioning from central access to an end-on retreat sequence with stopes in the diminishing pillar being extracted as triple lifts. Initially, a triple lift extraction methodology was implemented to eliminate the exposure of personnel and equipment to potentially seismically active ground as the closure pillar was extracted. All production activities for the closure pillar were conducted outside the oredrives from a drive situated in the hanging wall. Intense episodes of seismic activity occurred during the third and fourth quarters of 2015 as well as early in the first quarter of 2016 while the closure pillar was being extracted. During this period, two rockbursts occurred; after the second rockburst, management decided to temporarily halt production activities in the area pending geotechnical investigation and the development of a new extraction strategy.A Geotechnical Review Board (GRB) was formed to review and evaluate the situation to date and provide guidance on: the extraction sequence, ground support design and implementation, and seismic monitoring requirements. Following the GRB evaluation, a program of works was initiated including assessment of various extraction sequences and dynamic ground support design. Subsequently, these have been implemented and mining activities have resumed. This paper provides an overview of the mining practices that led to increased seismicity and rockbursts as well as measures that were implemented to mitigate the hazard associated with increased mining-induced seismicity and increasing stress levels.
机译:进化矿业的青蛙地下地区的地震事件和岩石兵的数量增加了2015年。这是由于采矿深度和不利的采矿几何形状增加而增加的压力水平(采矿剩余贫柱)以及与互动相互作用一些地震活跃的横切地质结构。当时,提取序列从中央进入到端部撤退序列,在减少柱子中被提取为三重升降机。最初,实施了三升提取方法,以消除人员和设备的暴露,以潜在地震活动接地,因为闭合柱被提取。关闭支柱的所有生产活动都是通过位于悬挂墙壁的驱动器外部进行的。 2015年第三季度以及2016年第四季度的第三季度发生的激烈剧集,而闭合柱正在提取。在此期间,发生了两次摇滚乐;在第二次摇滚爆发后,管理层决定暂时停止在未决岩土工程调查和新的提取策略的发展中的生产活动。岩土内审查委员会(GRB)成立,以审查和评估迄今为止的情况并提供指导提取序列,地面支持设计和实现,以及地震监测要求。在GRB评估之后,启动了一种工程计划,包括评估各种提取序列和动态地面支持设计。随后,已经实施了这些,挖掘活动已恢复。本文概述了导致地震性和摇滚症的采矿实践以及实施的措施,以减轻与增加的采矿诱导的地震性和增加应力水平相关的危害。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号