Research on Simulation and Field Measurement Technology of Floor Mining Failure Depth

机译:地板采矿深度模拟与现场测量技术研究

获取原文

摘要

Aiming at the detection problem of floor mining failure zone after mining, in order to grasp the failure law of floor strata caused by mining and ensure the safe mining on confined water, in this paper, the methods of the theoretical prediction and FLAC~(3D) numerical simulation was adopted to study floor mining failure depth of the 41303 working face in Huafeng coal mine, and then the system of double ends borehole plugging device in measuring leakage was applied to the field measurement to verify the theoretical prediction and numerical simulation results, and the results of the three methods were compared. The research shows that: (1) the prediction depth of floor mining failure depth is 16.89~21.24mm, and the numerical simulation results are 15m, and the measured depth is 13.15m; (2) Through comparison, it can be seen that the numerical simulation result is basically close to the field measured result. The result of empirical formula is expected to be conservative. In summary, the maximum floor mining failure depth of the 41303 working face is 13.15m. It provides scientific basis for the safe mining of coal resources under the pressure of the confined water; (3) With the advancing of the 41303 working face, the plastic zone of the bottom plate is increasing. When the working surface reaches 90m, the depth of the floor mining failure reaches the maximum value of 15m, and the depth is no longer increased and its shape is a straight line which is approximately parallel to the floor. the change trend of plastic zone is consistent with the maximum principal stress.
机译:针对开采后地面开采破坏区的检测问题,以掌握造成开采底板的破坏规律,保证安全开采的承压水,本文的理论预测和FLAC〜的,方法(3D )数值模拟获得通过到41303工作面在华丰煤矿,然后双端的系统的研究地板挖掘破坏深度钻孔中测量被施加于场测量,以验证了理论预测和数值模拟的结果泄漏堵塞装置,和三种方法的结果进行比较。研究表明:(1)地板挖掘破坏深度的预测深度为16.89〜21.24毫米,和数值模拟的结果是15M,和所测量的深度是13.15米; (2)通过比较,可以看出,模拟结果是基本上接近于场测量结果。经验公式的结果预计将是保守的。综上所述,41303工作面的最大地面开采破坏深度是13.15米。它提供了煤炭资源的承压水的压力下安全开采提供科学依据; (3)在41303工作面的前进,底板的塑性区正在增加。当工作表面到达90米,地板采矿故障的深度达到15米的最大值,并且深度不再增加,并且它的形状为一条直线,其大致平行于地板。塑性区的变化趋势与最大主应力是一致的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号