首页> 外文会议>Russian-Chinese Symposium on Coal in the 21st century: Mining, Processing, Safety >Filling of the Vertical Mine Workings with the Autoclave Slag-concrete
【24h】

Filling of the Vertical Mine Workings with the Autoclave Slag-concrete

机译:用高压釜渣 - 混凝土填充垂直矿井工作

获取原文

摘要

The results of laboratory experimental research in the production of the filling autoclaved slag-concrete made of slag wastes and lime are considered in the article, the methods of filling of abandoned vertical mine workings with the slag-concrete blocks, which are made either directly in the mine working or on the surface of the mine. The developed ways of a backfill will allow to ensure ecological safety of the territories adjacent to the vertical mine working and at the same time to utilize technogenic slag waste of the fuel and energy enterprises, also as a result of this research nonshrinking and waterproof autoclave concrete and technology of its production will find an application in a construction complex as alternative cement concrete, and can be used in construction of the bases, walls, dams, dikes, and other precast concretestructures.
机译:在制品中考虑了由炉渣废物和石灰制成的填充填充的填充滑动炉渣混凝土的实验室实验研究结果,用炉渣混凝土块填充废弃的垂直矿井工作的方法,即直接进入矿井工作或矿井表面。回填的开发方式将允许确保毗邻垂直矿井的地区的生态安全,同时使用燃料和能源企业的技术渣浪费,同时也是本研究Nonshrinking和防水高压釜混凝土其生产技术将在替代水泥混凝土中找到一个在建筑复合物中的应用,可用于构造基地,墙壁,坝,堤坝和其他预制混凝土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号