首页> 外文会议>International Conference on Education, Concept, and Application of Green Technology >Simulating on Water Storage and Pump Capacity of 'Kencing' River Polder System in Kudus Regency, Central Java, Indonesia
【24h】

Simulating on Water Storage and Pump Capacity of 'Kencing' River Polder System in Kudus Regency, Central Java, Indonesia

机译:在印度尼西亚中部爪哇省吉瓦河河圩区储水和泵容量模拟

获取原文

摘要

Settlement in the Jati District, Kudus Regency, Central Java Province, Indonesia, is growing rapidly. Previous paddy fields area turns into new residential, industrial and office buildings. The rain water collected in small Kencing river that flows into big Wulan River. But the current condition, during high rain intensity Wulan river water elevation higher than the Kencing river, so that water can not flow gravity and the area inundated. To reduce the flooding, required polder drainage system by providing a long channel as water storage and pumping water into Wulan river. How to get optimal value of water storage volume, drainage system channels and the pump capacity? The result used to be efficient in the operation and maintenance of the polder system. The purpose of this study is to develop some scenarios water storage volume, water gate operation and to get the optimal value of operational pumps removing water from the Kencing River to Wulan River. Research Method is conducted by some steps. The first step, it is done field orientation in detail, then collecting secondary data including maps and rainfall data. The map is processed into Watershed or catchment area, while the rainfall data is processed into runoff discharge. Furthermore, the team collects primary data by measuring topography to determine the surface and volume of water storage. The analysis conducted to determine of flood discharge, water channel hydraulics, water storage volume and pump capacity corresponding. Based on the simulating of long water storage volume and pump capacity with some scenario trying, it can be determined optimum values. The results used to be guideline in to construction proses, operation and maintenance of the drainage polder system.
机译:印度尼西亚中部爪哇省吉瓦省吉迪斯地区的杰迪区和解正在迅速增长。以前的稻田区域变成了新的住宅,工业和办公楼。雨水收集在小型河流中,流入大武兰河。但目前的条件,在高雨强度武兰河水海拔高于大岭河,使水不能重力和面积淹没。为了减少洪水,通过提供长通道作为储水和泵送进入武兰河的洪水排水系统。如何获得储水量,排水系统通道和泵容量的最佳价值?结果用于高效的圩区系统的操作和维护。本研究的目的是开发一些情景储存量,水闸操作,并获得从电扎到乌兰河的运营泵的最佳价值。研究方法是通过一些步骤进行的。第一步,它详细完成了现场取向,然后收集包括地图和降雨数据的次要数据。将地图加工到流域或集水区,而降雨数据被加工成径流放电。此外,该团队通过测量地形来确定储水的表面和体积来收集主要数据。该分析以确定洪水排放,水通道液压,储水量和泵容量对应。基于使用一些场景的长储水量和泵容量的模拟,可以确定最佳值。结果曾经是施工采用,操作和维护引流开拓者系统的准则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号