Hazard identification, risk analysis and risk assessment on high-rise building construction project

机译:高层建筑建设项目危害识别,风险分析及风险评估

获取原文

摘要

High-Rise Building (HRB) construction project has complicated the structural design, complexity of work and potential risks in project work. Project risk can obstruct the project activities and achievement. The objectives of this paper are to identify the risks of technical and construction management, allocate the risk to appropriate parties, namely owner, contractor, and shared (owner and contractor), and assign the risk response to dominant risk in the HRB project. Identification of risk was conducted through literature study and validation of the preliminary survey. The risks analysis based on the results of main survey was carried out with severity index method combined with matrix of impact probability. The dominant risks were allocated to the contractor, owner and shared. The results showed that there are eight risks in time impact and seven risks in cost impact from 35 variables of risk. The main impact to time and cost is the low level of productivity.
机译:高层建筑(HRB)建设项目使结构设计,工作复杂性和项目工作中的潜在风险复杂化。项目风险可以阻碍项目活动和成就。本文的目标是确定技术和施工管理的风险,为适当缔约方,即所有者,承包商和共享(所有者和承包商)分配风险,并将风险反应分配对HRB项目的主导风险。通过文献研究和初步调查的验证进行风险识别。基于主要调查结果的风险分析是以严重性指数法与影响概率矩阵结合进行的。主导风险被分配给承包商,所有者和分享。结果表明,在35个风险变量的情况下,有8个时间影响和成本影响的七种风险。主要影响到时间和成本是生产力的低水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号